CERN is now setting up String 2 [1], a full-size proto-type of a regular cell of the LHC arc. It is composed of two quadrupole, six dipole magnets, and a separate cryogenic distribution line (QRL) for the supply and recovery of the cryogen. An electrical feed box (DFB), with up to 38 High Temperature Superconducting (HTS) leads, powers the magnets. About 700 sensors and actuators are distributed along four Profibus DP and two Profibus PA field buses. The process automation is handled by two controllers, running 126 Closed Control Loops (CCL). This paper describes the cryogenic control system, associated instrumentation, and their commissioning.
The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most pow...
Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
CERN is now setting up String 2 [1], a full-size proto-type of a regular cell of the LHC arc. It is ...
CERN is now setting up String 2, a full-size prototype of a regular cell of the LHC arc. It is compo...
String2 was a 120 m full-scale model of a regular cell of the LHC accelerator arc. It was composed o...
This paper describes the cryogenic control system and associated instrumentation of the test facilit...
The assembly of the first version of the LHC test string has now been completed and commissioned. It...
A 107-m long superconducting magnet string representing a full-cell of the LHC machine was designed ...
The Large Hadron Collider (LHC) at CERN is a superconducting accelerator and proton-proton collider ...
The Large Hadron Collider makes extensive use of superconductors, in magnets for bending and focusin...
The Large Hadron Collider (LHC) was commissioned at CERN and started operation with beams in 2008. T...
For the LHC, 1232 dipole magnets and about 400 quadrupole magnets operating at 1.9 K are installed i...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
This paper reports on the control system of a cryogenic test facility for High Temperature Supercond...
The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most pow...
Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
CERN is now setting up String 2 [1], a full-size proto-type of a regular cell of the LHC arc. It is ...
CERN is now setting up String 2, a full-size prototype of a regular cell of the LHC arc. It is compo...
String2 was a 120 m full-scale model of a regular cell of the LHC accelerator arc. It was composed o...
This paper describes the cryogenic control system and associated instrumentation of the test facilit...
The assembly of the first version of the LHC test string has now been completed and commissioned. It...
A 107-m long superconducting magnet string representing a full-cell of the LHC machine was designed ...
The Large Hadron Collider (LHC) at CERN is a superconducting accelerator and proton-proton collider ...
The Large Hadron Collider makes extensive use of superconductors, in magnets for bending and focusin...
The Large Hadron Collider (LHC) was commissioned at CERN and started operation with beams in 2008. T...
For the LHC, 1232 dipole magnets and about 400 quadrupole magnets operating at 1.9 K are installed i...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
This paper reports on the control system of a cryogenic test facility for High Temperature Supercond...
The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most pow...
Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...