General equations are presented for predicting loss of prestress and camber of both composite and non- composite prestressed concrete structures. Continuous time functins of all parameters needed to solve the equations are given, and sample results included. Computed prestress loss and camber are compared with experimental data for normal weight and lightweight concrete. Methods are also presented for predicting the effect of non-prestressed tension steel in reducing time-dependent loss of prestress and camber, and for the determination of short-time deflections of uncracked and cracked prestressed members. Comparisons with experimental results are indicated for these partially prestressed methods
In February of 1968 a cooperative research project by the Iowa State Highway Commission (Project No....
Camber and long-term deflections are directly linked to the loss of prestressing force, a characteri...
The discrepancies between the designed and measured camber of precast pretensioned concrete beams (P...
779852628Final report; 8/16/2009-3/31/2011.PDFTech ReportFHWA/NC/2010-05CurvatureDeflectionPrestress...
Many precast, prestressed concrete girders have camber less or higher than the design values. This d...
US Transportation Collection2021PDFTech ReportCakmak, FurkanMenkulasi, FatmirEamon, Christopher D.Vi...
The camber at the time of bridge erection of prestressed concrete bridge girders predicted by the Mi...
US Transportation Collection2019PDFTech ReportAlmohammedi, AhmedHale, W MicahUniversity of Arkansas,...
A methodology to predict each stage of camber and displacements in composite prestressed concrete an...
An investigation has been undertaken into the factors affecting the time-dependent deformations, pr...
US Transportation Collection2019PDFTech ReportMante, David MBarnes, Robert W.Schindler, Anton K.Hofr...
Presented in this report is an investigation of the use of "sand-lightweight" concrete in prestresse...
The discrepancies between the designed and measured camber of precast pretensioned concrete beams (P...
US Transportation Collection2019PDFTech ReportMante, David MBarnes, Robert W.Schindler, Anton K.Hofr...
PDFTech Reporthttp://ntl.bts.gov/lib/55000/55600/55683/IADOT_TR_625_InTrans_Honarvar_Improving_Cambe...
In February of 1968 a cooperative research project by the Iowa State Highway Commission (Project No....
Camber and long-term deflections are directly linked to the loss of prestressing force, a characteri...
The discrepancies between the designed and measured camber of precast pretensioned concrete beams (P...
779852628Final report; 8/16/2009-3/31/2011.PDFTech ReportFHWA/NC/2010-05CurvatureDeflectionPrestress...
Many precast, prestressed concrete girders have camber less or higher than the design values. This d...
US Transportation Collection2021PDFTech ReportCakmak, FurkanMenkulasi, FatmirEamon, Christopher D.Vi...
The camber at the time of bridge erection of prestressed concrete bridge girders predicted by the Mi...
US Transportation Collection2019PDFTech ReportAlmohammedi, AhmedHale, W MicahUniversity of Arkansas,...
A methodology to predict each stage of camber and displacements in composite prestressed concrete an...
An investigation has been undertaken into the factors affecting the time-dependent deformations, pr...
US Transportation Collection2019PDFTech ReportMante, David MBarnes, Robert W.Schindler, Anton K.Hofr...
Presented in this report is an investigation of the use of "sand-lightweight" concrete in prestresse...
The discrepancies between the designed and measured camber of precast pretensioned concrete beams (P...
US Transportation Collection2019PDFTech ReportMante, David MBarnes, Robert W.Schindler, Anton K.Hofr...
PDFTech Reporthttp://ntl.bts.gov/lib/55000/55600/55683/IADOT_TR_625_InTrans_Honarvar_Improving_Cambe...
In February of 1968 a cooperative research project by the Iowa State Highway Commission (Project No....
Camber and long-term deflections are directly linked to the loss of prestressing force, a characteri...
The discrepancies between the designed and measured camber of precast pretensioned concrete beams (P...