When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February 1996 a detailed cost estimate was submitted to the DOE for completing the two remaining Phase 2 Multi Annular Swirl Burner (MASB) topping combustor test campaigns; in August 1996 release was received from FETC to proceed with the two campaigns to: (1) test the MASB at proposed demonstration plant full to minimum load operating conditions; (2) identify the lower oxygen limit of the MASB; (3) demonstrate natural gas to carbonizer fuel gas switching; and (4) demonstrate operation with low temperature compressor discharge air rather than high temperature ({approx} 1,600 F) vitiated air. The 18 in. MASB was last tested at the University of Tennes...
Research is being conducted under a United States Department of Energy (USDOE) contract to develop a...
Research is being conducted to develop a new type of coal fired plant for electric power generation....
In the second half of calendar year 1998, no work was performed on the present project. The 20 MMBtu...
When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February...
When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February...
No work was performed on Phase 2; the two remaining Multi Annular Swirl Burner test campaigns are on...
When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February...
No work was performed; the two remaining Multi Annular Swirl Burner test campaigns are on hold pendi...
No work was performed; the two remaining Multi Annular Swirl Burner test campaigns are on hold pendi...
Second-generation on pressurized fluidized bed combustion (PFBC) plants promise higher efficiency wi...
Advanced or second-generation pressurized fluidized bed combustion plants (APFBC) that generate elec...
Research has been conducted under United States Department of Energy Contract (USDOE) DE-AC21-86MC21...
Shortly after the year 2000 it is expected that new generating plants will be needed to meet the gro...
The economics and performance of advanced pressurized fluidized bed (PFBC) cycles developed for util...
Research is being conducted under United States Department of Energy (USDOE) Contract DE-AC21-86MC21...
Research is being conducted under a United States Department of Energy (USDOE) contract to develop a...
Research is being conducted to develop a new type of coal fired plant for electric power generation....
In the second half of calendar year 1998, no work was performed on the present project. The 20 MMBtu...
When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February...
When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February...
No work was performed on Phase 2; the two remaining Multi Annular Swirl Burner test campaigns are on...
When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February...
No work was performed; the two remaining Multi Annular Swirl Burner test campaigns are on hold pendi...
No work was performed; the two remaining Multi Annular Swirl Burner test campaigns are on hold pendi...
Second-generation on pressurized fluidized bed combustion (PFBC) plants promise higher efficiency wi...
Advanced or second-generation pressurized fluidized bed combustion plants (APFBC) that generate elec...
Research has been conducted under United States Department of Energy Contract (USDOE) DE-AC21-86MC21...
Shortly after the year 2000 it is expected that new generating plants will be needed to meet the gro...
The economics and performance of advanced pressurized fluidized bed (PFBC) cycles developed for util...
Research is being conducted under United States Department of Energy (USDOE) Contract DE-AC21-86MC21...
Research is being conducted under a United States Department of Energy (USDOE) contract to develop a...
Research is being conducted to develop a new type of coal fired plant for electric power generation....
In the second half of calendar year 1998, no work was performed on the present project. The 20 MMBtu...