When DOE funds were exhausted in March 1995, all Phase 2 activities were placed on hold. In February 1996 a detailed cost estimate was submitted to the DOE for completing the two remaining Phase 2 Multi Annular Swirl Burner (MASB) topping combustor test burns; in August 1996 release was received from METC to proceed with these tests. The first test (Test Campaign No.3) will be conducted to: (1) test the MASB at proposed demonstration plant full to minimum loading operating conditions; (2) identify the lower oxygen limit of the MASB; and (3) demonstrate natural gas to carbonizer fuel gas switching. The Livingston Phase 3 Pilot Plant was last operated under contract DE-AC21-86MC21023 in September 1995 for seven days in an integrated carbonize...