This final report from VFL Technologies for the pilot-scale thermal treatment of lower East Fork Poplar Creek floodplain soils dated September 1994 contains LEFPC Appendices, Volume 6, Appendix VI - X. These appendices cover the following areas: chain of custody, miscellaneous process calculations (residence time and orifice plate calculations), waste management (mercury and radiation confirmatory testing before and after final verification run), health and safety (training, respirator fit test and radiation work permits), and transportation (soil receipt documentation)
The 1992 Oak Ridge Reservation Federal Facilities Compliance Agreement (FFCA) listed a number of mix...
The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reserv...
During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot...
This document contains Appendix I-IV for the pilot-scale thermal treatment of lower East Fork Poplar...
This final report from VFL Technologies for the pilot-scale thermal treatment of lower East Fork Pop...
The Lower East Fork Poplar Creek (LEFPC) extends fourteen (14) miles through Oak Ridge, TN. The Cree...
IT Corporation (IT) was contracted by Martin Marietta Energy Systems, Inc. (Energy Systems) to perfo...
This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (RO...
Thermal desorption is an innovative technology that has seen significant growth in applications to o...
The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated so...
This report was prepared in accordance with CERCLA requirements to present the plan for baseline and...
Management Project (FEMP) personnel in Ohio to assess approaches to remediating volatile organic com...
The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated so...
This document is a draft final report for US DOE contract entitled, {open_quotes}Demonstration Testi...
During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot...
The 1992 Oak Ridge Reservation Federal Facilities Compliance Agreement (FFCA) listed a number of mix...
The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reserv...
During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot...
This document contains Appendix I-IV for the pilot-scale thermal treatment of lower East Fork Poplar...
This final report from VFL Technologies for the pilot-scale thermal treatment of lower East Fork Pop...
The Lower East Fork Poplar Creek (LEFPC) extends fourteen (14) miles through Oak Ridge, TN. The Cree...
IT Corporation (IT) was contracted by Martin Marietta Energy Systems, Inc. (Energy Systems) to perfo...
This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (RO...
Thermal desorption is an innovative technology that has seen significant growth in applications to o...
The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated so...
This report was prepared in accordance with CERCLA requirements to present the plan for baseline and...
Management Project (FEMP) personnel in Ohio to assess approaches to remediating volatile organic com...
The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated so...
This document is a draft final report for US DOE contract entitled, {open_quotes}Demonstration Testi...
During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot...
The 1992 Oak Ridge Reservation Federal Facilities Compliance Agreement (FFCA) listed a number of mix...
The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reserv...
During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot...