The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Som...
This Waste Management Plan (WMP) for the Bear Creek Valley Treatability Study addresses waste manage...
This Waste Management Plant (WMP) for the Bear Creek Valley Treatability Study addresses waste manag...
This report was prepared in accordance with CERCLA requirements to present the plan for baseline and...
The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated so...
Remedial action for Lower East Fork Poplar Creek, as defined by the Record of Decision, requires tha...
The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reserv...
This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (RO...
The Remedial Design Work Plan (RDWP) for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) ...
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), ...
This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in ...
On January 1, 1992, the US Department of Energy (DOE), the US Environmental Protection Agency (EPA) ...
On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (OR...
The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Departm...
This document provides the Environmental Restoration Program with information about the erosion and ...
This waste management plan defines the procedures for control and management of waste generated as a...
This Waste Management Plan (WMP) for the Bear Creek Valley Treatability Study addresses waste manage...
This Waste Management Plant (WMP) for the Bear Creek Valley Treatability Study addresses waste manag...
This report was prepared in accordance with CERCLA requirements to present the plan for baseline and...
The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated so...
Remedial action for Lower East Fork Poplar Creek, as defined by the Record of Decision, requires tha...
The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reserv...
This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (RO...
The Remedial Design Work Plan (RDWP) for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) ...
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), ...
This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in ...
On January 1, 1992, the US Department of Energy (DOE), the US Environmental Protection Agency (EPA) ...
On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (OR...
The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Departm...
This document provides the Environmental Restoration Program with information about the erosion and ...
This waste management plan defines the procedures for control and management of waste generated as a...
This Waste Management Plan (WMP) for the Bear Creek Valley Treatability Study addresses waste manage...
This Waste Management Plant (WMP) for the Bear Creek Valley Treatability Study addresses waste manag...
This report was prepared in accordance with CERCLA requirements to present the plan for baseline and...