The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF). The Pit Disassembly and Conversion Facility (PDCF), which is being costed in a separate report will also be located in the FMEF in this co- location option. The technical engineering data used as the basis for this study is presented in the EIS Data Call Input Report, `Plutonium Immobilization Plant Using Ceramic in Existing Facilities at Hanford.` The FMEF will require minimal facility modifications to accommodate the Plutonium Immobilization Plant (PIP). Adequate space is avai...
The Plutonium Finishing Plant (PFP) consists of a number of process and support buildings for handli...
The Plutonium Immobilization Plant (PIP) accepts plutonium (Pu) from pit conversion and from non-pit...
The costs of the chemical and metallurgical steps in the fuel cycle for large desalination reactors ...
A planned new facility, the Pit Disassembly and Conversion Facility (PDCF) will be used to disassemb...
This design-only conceptual design report (DOCDR) was prepared to support a funding request by the D...
The Department of Energy (DOE) has declared approximately 38.2 tonnes of weapons-grade plutonium to ...
This design-only conceptual design report was prepared to support a funding request by the Departmen...
A significant portion of the surplus plutonium is in the form of pits, a nuclear weapons component. ...
The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, dec...
Immobilization is the fixation of the surplus fissile materials in an acceptable matrix such as glas...
The U.S. Department of Energy (DOE) needs to remove irradiated fuel from the Plutonium-Uranium Extra...
A number of existing US facilities were evaluated for use as a mixed-oxide fuel fabrication facility...
The deactivated 233-S Plutonium Concentration Facility (233-S Facility) is located in the 200 Area. ...
In 2002, the Richland Operations Office (RL) of the US Department of Energy (DOE), the US Environmen...
This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technolo...
The Plutonium Finishing Plant (PFP) consists of a number of process and support buildings for handli...
The Plutonium Immobilization Plant (PIP) accepts plutonium (Pu) from pit conversion and from non-pit...
The costs of the chemical and metallurgical steps in the fuel cycle for large desalination reactors ...
A planned new facility, the Pit Disassembly and Conversion Facility (PDCF) will be used to disassemb...
This design-only conceptual design report (DOCDR) was prepared to support a funding request by the D...
The Department of Energy (DOE) has declared approximately 38.2 tonnes of weapons-grade plutonium to ...
This design-only conceptual design report was prepared to support a funding request by the Departmen...
A significant portion of the surplus plutonium is in the form of pits, a nuclear weapons component. ...
The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, dec...
Immobilization is the fixation of the surplus fissile materials in an acceptable matrix such as glas...
The U.S. Department of Energy (DOE) needs to remove irradiated fuel from the Plutonium-Uranium Extra...
A number of existing US facilities were evaluated for use as a mixed-oxide fuel fabrication facility...
The deactivated 233-S Plutonium Concentration Facility (233-S Facility) is located in the 200 Area. ...
In 2002, the Richland Operations Office (RL) of the US Department of Energy (DOE), the US Environmen...
This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technolo...
The Plutonium Finishing Plant (PFP) consists of a number of process and support buildings for handli...
The Plutonium Immobilization Plant (PIP) accepts plutonium (Pu) from pit conversion and from non-pit...
The costs of the chemical and metallurgical steps in the fuel cycle for large desalination reactors ...