In 2002, the Richland Operations Office (RL) of the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) developed milestones for transitioning the Plutonium Finishing Plant (PFP) facility to a clean slab-on-grade configuration. These milestones required developing an engineering evaluation/cost analysis (EF/CA) for the facility's sub-grade structures and installations as part of a series of evaluations intended to provide for the transition of the facility to a clean slab-on-grade configuration. In addition to supporting decisions for interim actions, the analyses of sub-grade structures and installations performed through this EE/CA will contribute to the rem...
The 232-Z Plutonium Incinerator Facility was a small, highly alpha-contaminated, building situated b...
The Plutonium Finishing Plant at the Department of Energy's Hanford Site in southeastern Washington ...
The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for ...
An engineering evaluation/cost analysis (EE/CA) was performed at the Hanford Site's Plutonium Finish...
This paper documents the fiscal year (FY) 2006 assessment to evaluate potential chemical and radiolo...
The Plutonium Finishing Plant (PFP) was constructed as part of the Manhattan Project during World Wa...
Maintaining compliance with environmental regulatory requirements is a significant priority in succe...
The Plutonium Finishing Plant (PFP) consists of a number of process and support buildings for handli...
This paper describes the deactivation and source term reduction activities conducted over the recent...
Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste T...
The demolition of highly contaminated plutonium buildings usually is a long and expensive process th...
At the Rocky Flats Environmental Technology Site (RFETS), the D&D task is enormous. Tons of plut...
The United States (U.S.) has identified 61.5 metric tons (MT) of plutonium that is permanently exces...
One of the many restoration challenges for the Hanford Site is the disposal of eight plutonium produ...
This report provides the results of an engineering study that evaluated the available technologies f...
The 232-Z Plutonium Incinerator Facility was a small, highly alpha-contaminated, building situated b...
The Plutonium Finishing Plant at the Department of Energy's Hanford Site in southeastern Washington ...
The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for ...
An engineering evaluation/cost analysis (EE/CA) was performed at the Hanford Site's Plutonium Finish...
This paper documents the fiscal year (FY) 2006 assessment to evaluate potential chemical and radiolo...
The Plutonium Finishing Plant (PFP) was constructed as part of the Manhattan Project during World Wa...
Maintaining compliance with environmental regulatory requirements is a significant priority in succe...
The Plutonium Finishing Plant (PFP) consists of a number of process and support buildings for handli...
This paper describes the deactivation and source term reduction activities conducted over the recent...
Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste T...
The demolition of highly contaminated plutonium buildings usually is a long and expensive process th...
At the Rocky Flats Environmental Technology Site (RFETS), the D&D task is enormous. Tons of plut...
The United States (U.S.) has identified 61.5 metric tons (MT) of plutonium that is permanently exces...
One of the many restoration challenges for the Hanford Site is the disposal of eight plutonium produ...
This report provides the results of an engineering study that evaluated the available technologies f...
The 232-Z Plutonium Incinerator Facility was a small, highly alpha-contaminated, building situated b...
The Plutonium Finishing Plant at the Department of Energy's Hanford Site in southeastern Washington ...
The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for ...