Measurements of the Productions run of Fermilab Main Injector Dipole magnets is underway. Redundant strength measurements provide a set of data which one can fit to mechanical and magnetic properties of the assembly. Plots of the field contribution from the steel supplement the usual plots of transfer function (B/I) vs. I in providing insight into the measured results
We discuss the design and layout of the refrigeration, transfer, and magnet systems. We also present...
Operation of the Fermilab Main Injector is sensitive to magnetic field differences due to hysteretic...
The 8 GeV transfer line feeding protons into the new Fermilab Main Injector has been built using str...
Measurements of the Fermilab Main Injector dipoles using a partially redundant system of integrated ...
Measurements of 230 6-meter and 136 4-meter dipoles constructed for the Fermilab Main Injector were ...
A large sample of the 6-meter dipoles for the Fermilab Main In-jector have been fabricated and measu...
A large sample of the 2.54-meter quadrupoles for lattice matching in the Fermilab Main Injector have...
Twelve dipole magnets were built under the R&D phase of the Fermilab Main Injector project using...
A flux measurement system has been developed for measuring the integrated strength and relative shap...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
At Fermilab we have operated a production line for the fabrication of go1 21 foot long superconducti...
The transfer line that will serve to transport 8 GeV protons from the Booster to the new Fermilab Ma...
This paper presents preliminary results of magnetic field measurements made on a series of 50 mm ape...
New horizontal and vertical trim dipoles have been designed for the Fermilab Main Injector (FMI) and...
We discuss the design and layout of the refrigeration, transfer, and magnet systems. We also present...
Operation of the Fermilab Main Injector is sensitive to magnetic field differences due to hysteretic...
The 8 GeV transfer line feeding protons into the new Fermilab Main Injector has been built using str...
Measurements of the Fermilab Main Injector dipoles using a partially redundant system of integrated ...
Measurements of 230 6-meter and 136 4-meter dipoles constructed for the Fermilab Main Injector were ...
A large sample of the 6-meter dipoles for the Fermilab Main In-jector have been fabricated and measu...
A large sample of the 2.54-meter quadrupoles for lattice matching in the Fermilab Main Injector have...
Twelve dipole magnets were built under the R&D phase of the Fermilab Main Injector project using...
A flux measurement system has been developed for measuring the integrated strength and relative shap...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
At Fermilab we have operated a production line for the fabrication of go1 21 foot long superconducti...
The transfer line that will serve to transport 8 GeV protons from the Booster to the new Fermilab Ma...
This paper presents preliminary results of magnetic field measurements made on a series of 50 mm ape...
New horizontal and vertical trim dipoles have been designed for the Fermilab Main Injector (FMI) and...
We discuss the design and layout of the refrigeration, transfer, and magnet systems. We also present...
Operation of the Fermilab Main Injector is sensitive to magnetic field differences due to hysteretic...
The 8 GeV transfer line feeding protons into the new Fermilab Main Injector has been built using str...