A large sample of the 6-meter dipoles for the Fermilab Main In-jector have been fabricated and measured. The resulting proper-ties are reported and compared to the accelerator requirements. I. Magnet requirements The Fermilab Main Injector is a new proton and antiproton accelerator currently under construction at Fermi National Ac-celerator Laboratory [1]. It will replace the existing Main Ring in all functions. While many of the Main Ring quadrupoles will be reused in the Main Injector, the dipoles are a new design. The performance requirements of the dipoles have been stud-ied extensively [2]. The two significant areas of magnetic per-formance are the magnet-to-magnet variation in the integrated magnetic field (“strength”) and the variati...
At Fermilab we have operated a production line for the fabrication of go1 21 foot long superconducti...
In this paper, the importance of magnetic material measurements in the framework of the design of ma...
Fermilab has nearly completed an upgrade to its accelerator complex which is called the Fermilab Mai...
A large sample of the 2.54-meter quadrupoles for lattice matching in the Fermilab Main Injector have...
A large sample of the 2.54-meter quadrupoles for lattice matching in the Fermilab Main Injector have...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
Measurements of 230 6-meter and 136 4-meter dipoles constructed for the Fermilab Main Injector were ...
Measurements of the Productions run of Fermilab Main Injector Dipole magnets is underway. Redundant ...
The Main Injector project at Fermilab requires a dipole with good field quality from 0.1 T to 1.73 T...
New horizontal and vertical trim dipoles have been designed for the Fermilab Main Injector (FMI) and...
A flux measurement system has been developed for measuring the integrated strength and relative shap...
Twelve dipole magnets were built under the R&D phase of the Fermilab Main Injector project using...
Measurements of the Fermilab Main Injector dipoles using a partially redundant system of integrated ...
The transfer line that will serve to transport 8 GeV protons from the Booster to the new Fermilab Ma...
At Fermilab we have operated a production line for the fabrication of go1 21 foot long superconducti...
In this paper, the importance of magnetic material measurements in the framework of the design of ma...
Fermilab has nearly completed an upgrade to its accelerator complex which is called the Fermilab Mai...
A large sample of the 2.54-meter quadrupoles for lattice matching in the Fermilab Main Injector have...
A large sample of the 2.54-meter quadrupoles for lattice matching in the Fermilab Main Injector have...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
All of the new quadrupoles for the Fermilab Main Injector ring have been built and measured. The mag...
Measurements of 230 6-meter and 136 4-meter dipoles constructed for the Fermilab Main Injector were ...
Measurements of the Productions run of Fermilab Main Injector Dipole magnets is underway. Redundant ...
The Main Injector project at Fermilab requires a dipole with good field quality from 0.1 T to 1.73 T...
New horizontal and vertical trim dipoles have been designed for the Fermilab Main Injector (FMI) and...
A flux measurement system has been developed for measuring the integrated strength and relative shap...
Twelve dipole magnets were built under the R&D phase of the Fermilab Main Injector project using...
Measurements of the Fermilab Main Injector dipoles using a partially redundant system of integrated ...
The transfer line that will serve to transport 8 GeV protons from the Booster to the new Fermilab Ma...
At Fermilab we have operated a production line for the fabrication of go1 21 foot long superconducti...
In this paper, the importance of magnetic material measurements in the framework of the design of ma...
Fermilab has nearly completed an upgrade to its accelerator complex which is called the Fermilab Mai...