The Interaction Region Vacuum System in the PEP-II B-Factory at SLAC must produce average pressures in the 10{sup -10} Torr range. low beamline pressures will minimize the background radiation encountered by the BaBar Detector A combination of copper and stainless steel vacuum chambers with continuous antechambers are used to make up the beam tubes. Linear Non-Evaporable Getter (NEG) pumps are used to produce distributed pumping along the length of these beam tubes. High conductance microwave type screens provide RF shields between the beam aperture and the NEG pumps. In this paper the design features of the beam tubes, NEG pumps, and RF pump screens are described and the vacuum and impedance analyses conducted in support of the design are ...
The paper presents an overview of the design of the RF system for the PEP-II B Factory. An RF statio...
We describe the present status of the PEP-II project. The project comprises four major systems: Inje...
The vacuum system for the proposed e+e- storage ring CESR must handle the high power-density of sync...
The design of the vacuum system for the PEP-II B Factory High-Energy Ring is reviewed. The thermal d...
We describe the Interaction Region (IR) for the PEP-II project, a collaboration of SLAC, LBNL, and L...
A design for a vacuum system for a possible compact high luminosity upgrade to CESR is presented. Th...
This new vacuum chamber has been installed from 12 to 21 meters upstream of the BaBar detector in th...
In this note we will take a first look at the design of the vacuum system inside the detector, i.e. ...
We describe the design and construction status of the Low-Energy Ring (LER) of the PEP-II project, ...
A storage ring with a circumference of 45 m is being built at Brookhaven to measure the g-2 value of...
The Future Circular Collider (FCC) Design Study includes a high-luminosity, low-emittance, two-ring ...
The six straight sections of the PEP II High Energy Ring (HER) serve various functions: lattice tuni...
Highly transparent vacuum chambers adapted to the requirements of the detectors have been installed ...
The multi-ampere currents required for high luminosity operation of an asymmetric B factory leads to...
The Compact Linear Collider, under study, requires vacuum chambers with a very small aperture, of th...
The paper presents an overview of the design of the RF system for the PEP-II B Factory. An RF statio...
We describe the present status of the PEP-II project. The project comprises four major systems: Inje...
The vacuum system for the proposed e+e- storage ring CESR must handle the high power-density of sync...
The design of the vacuum system for the PEP-II B Factory High-Energy Ring is reviewed. The thermal d...
We describe the Interaction Region (IR) for the PEP-II project, a collaboration of SLAC, LBNL, and L...
A design for a vacuum system for a possible compact high luminosity upgrade to CESR is presented. Th...
This new vacuum chamber has been installed from 12 to 21 meters upstream of the BaBar detector in th...
In this note we will take a first look at the design of the vacuum system inside the detector, i.e. ...
We describe the design and construction status of the Low-Energy Ring (LER) of the PEP-II project, ...
A storage ring with a circumference of 45 m is being built at Brookhaven to measure the g-2 value of...
The Future Circular Collider (FCC) Design Study includes a high-luminosity, low-emittance, two-ring ...
The six straight sections of the PEP II High Energy Ring (HER) serve various functions: lattice tuni...
Highly transparent vacuum chambers adapted to the requirements of the detectors have been installed ...
The multi-ampere currents required for high luminosity operation of an asymmetric B factory leads to...
The Compact Linear Collider, under study, requires vacuum chambers with a very small aperture, of th...
The paper presents an overview of the design of the RF system for the PEP-II B Factory. An RF statio...
We describe the present status of the PEP-II project. The project comprises four major systems: Inje...
The vacuum system for the proposed e+e- storage ring CESR must handle the high power-density of sync...