The six straight sections of the PEP II High Energy Ring (HER) serve various functions: lattice tuning, beam injection and abort, providing space for rf cavities, longitudinal and transverse feedback, beam diagnostics and the interaction point. A stainless steel vacuum system has been designed; prototypes are currently being built. Cooling is required due to radiation coming from the last arc dipole and resistive losses in the vacuum chamber. Although the nominal beam current of the HER is 1 A the vacuum system is designed for 3 A to provide margin and an upgrade path. 5 refs., 7 figs
This new vacuum chamber has been installed from 12 to 21 meters upstream of the BaBar detector in th...
A design for a vacuum system for a possible compact high luminosity upgrade to CESR is presented. Th...
The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now begin...
The design of the vacuum system for the PEP-II B Factory High-Energy Ring is reviewed. The thermal d...
The PEP-II High Energy Ring (HER), a 9 GeV electron storage ring, has been in commissioning since sp...
The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since Ju...
The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since Ju...
We describe the present status of the PEP-II project. The project comprises four major systems: Inje...
The 9 GeV High Energy Ring (HER) of the PEP-II B Factory is an electron storage ring under construct...
The PEP-II project has two storage rings. The HER (High Energy Ring) has up to 1.48 A of electron be...
We describe the design and construction status of the Low-Energy Ring (LER) of the PEP-II project, ...
Conceptual Design Report (CDR) [1] was issued in June 1993, considerable progress has been made at r...
In order to benefit from further reduction of the vertical IP beta function of the PEP-II high energ...
The vacuum system for the proposed e+e- storage ring CESR must handle the high power-density of sync...
We describe the design and construction status of theLow-Energy Ring (LER) of the PEP-II project, a ...
This new vacuum chamber has been installed from 12 to 21 meters upstream of the BaBar detector in th...
A design for a vacuum system for a possible compact high luminosity upgrade to CESR is presented. Th...
The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now begin...
The design of the vacuum system for the PEP-II B Factory High-Energy Ring is reviewed. The thermal d...
The PEP-II High Energy Ring (HER), a 9 GeV electron storage ring, has been in commissioning since sp...
The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since Ju...
The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since Ju...
We describe the present status of the PEP-II project. The project comprises four major systems: Inje...
The 9 GeV High Energy Ring (HER) of the PEP-II B Factory is an electron storage ring under construct...
The PEP-II project has two storage rings. The HER (High Energy Ring) has up to 1.48 A of electron be...
We describe the design and construction status of the Low-Energy Ring (LER) of the PEP-II project, ...
Conceptual Design Report (CDR) [1] was issued in June 1993, considerable progress has been made at r...
In order to benefit from further reduction of the vertical IP beta function of the PEP-II high energ...
The vacuum system for the proposed e+e- storage ring CESR must handle the high power-density of sync...
We describe the design and construction status of theLow-Energy Ring (LER) of the PEP-II project, a ...
This new vacuum chamber has been installed from 12 to 21 meters upstream of the BaBar detector in th...
A design for a vacuum system for a possible compact high luminosity upgrade to CESR is presented. Th...
The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now begin...