User requirements evolve in the process of software development. In the early phase of the ARETE project, we captured requirements from the ARETE target groups with the three surveys targeting primary school students, secondary school students, and teachers. Analysis results were distilled into different sets of requirements; many of which need to be addressed at the institutional (e.g., school governance) and governmental (e.g., educational authorities) levels, for instance, provision of quality digital devices to run AR applications (for details see D4.2 M18). These requirements entail long-term strategic changes and thus may only be addressed beyond the lifetime of the ARETE project, which is aimed to provide policymakers with empirical ...
In line with the iterative and agile spiral model approach, the development of the VITALISE ICT tool...
The recent and disruptive introduction of immersive technologies such as Augmented Reality into the ...
This report addresses ARETE Pilots 1 and 2 deployment plan and its implementation steps, including t...
User requirements evolve in the process of software development. In the early phase of the ARETE pro...
The deliverable D4.2 reports user needs and requirements from the ARETE target groups – primary and ...
This report addresses ARETE Pilots 1 and 2 requirements, design, and data management plans. The aim ...
D4.1 is the first deliverable of WP4 – User-centred Interactive Design. It consists of an introducti...
This is the last deliverable of WP4, which is built upon the existing work of the HCI team throughou...
This deliverable D4.5 reports the evaluation methods and results that WP4 has implemented and obtain...
ARETE (Augmented Reality Interactive Educational System) is a European project, which aims to develo...
The “Analysis of PBIS requirements for ARETE” report, addresses the capture and definition of requir...
This document reports on the evaluation of ARETE pilots 1, 2 and 3 . It presents the data collected ...
This deliverable updates the work done for Task 5.1. ‘AR Interactivity Requirements & Specification ...
This deliverable updates the work conducted for Task 5.3 “Development of an AR Interactive Component...
This report addresses ARETE Pilot 4 deployment plan and its implementation steps. Pilot 4 aims to ac...
In line with the iterative and agile spiral model approach, the development of the VITALISE ICT tool...
The recent and disruptive introduction of immersive technologies such as Augmented Reality into the ...
This report addresses ARETE Pilots 1 and 2 deployment plan and its implementation steps, including t...
User requirements evolve in the process of software development. In the early phase of the ARETE pro...
The deliverable D4.2 reports user needs and requirements from the ARETE target groups – primary and ...
This report addresses ARETE Pilots 1 and 2 requirements, design, and data management plans. The aim ...
D4.1 is the first deliverable of WP4 – User-centred Interactive Design. It consists of an introducti...
This is the last deliverable of WP4, which is built upon the existing work of the HCI team throughou...
This deliverable D4.5 reports the evaluation methods and results that WP4 has implemented and obtain...
ARETE (Augmented Reality Interactive Educational System) is a European project, which aims to develo...
The “Analysis of PBIS requirements for ARETE” report, addresses the capture and definition of requir...
This document reports on the evaluation of ARETE pilots 1, 2 and 3 . It presents the data collected ...
This deliverable updates the work done for Task 5.1. ‘AR Interactivity Requirements & Specification ...
This deliverable updates the work conducted for Task 5.3 “Development of an AR Interactive Component...
This report addresses ARETE Pilot 4 deployment plan and its implementation steps. Pilot 4 aims to ac...
In line with the iterative and agile spiral model approach, the development of the VITALISE ICT tool...
The recent and disruptive introduction of immersive technologies such as Augmented Reality into the ...
This report addresses ARETE Pilots 1 and 2 deployment plan and its implementation steps, including t...