The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. This assessment of the Corps of Engineers proposal is required by the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality Regulations (40 CFR 1500-1508), and the Corps of Engineers Procedures for Implementing NEPA (33 CFR Part 230)
15 pp. Maps, tables, references. T20S R7E, Section 35 NW 1/4. Captured May 17, 2007.Proposes to im...
A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate f...
BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan t...
The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects...
The Northwest Area Water Supply Project (Project) in North Dakota is a municipal, rural, and industr...
The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the p...
The Ames Mill Dam in Northfield, MN, is nearing the end of its functional lifespan, and planning and...
Pursuant to the requirements of Minn. Stat. ? 103G.245, subd. 1 and Minn. R. Ch. 6115 the Cities of ...
The Flood Diversion Board of Authority (Diversion Authority) is proposing to construct the FargoMoor...
The Savannah River Operations Office Strategic Plan directs Savannah River Site (SRS) to find ways t...
On cover: Environmental analysis, environmental impact statement, preparation plan, west central Nor...
The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential ...
2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dak...
For many years, residents of northwestern North Dakota have experienced water supply problems. Exist...
We develop a risk assessment framework for understanding how potential responses to dam removal vary...
15 pp. Maps, tables, references. T20S R7E, Section 35 NW 1/4. Captured May 17, 2007.Proposes to im...
A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate f...
BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan t...
The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects...
The Northwest Area Water Supply Project (Project) in North Dakota is a municipal, rural, and industr...
The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the p...
The Ames Mill Dam in Northfield, MN, is nearing the end of its functional lifespan, and planning and...
Pursuant to the requirements of Minn. Stat. ? 103G.245, subd. 1 and Minn. R. Ch. 6115 the Cities of ...
The Flood Diversion Board of Authority (Diversion Authority) is proposing to construct the FargoMoor...
The Savannah River Operations Office Strategic Plan directs Savannah River Site (SRS) to find ways t...
On cover: Environmental analysis, environmental impact statement, preparation plan, west central Nor...
The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential ...
2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dak...
For many years, residents of northwestern North Dakota have experienced water supply problems. Exist...
We develop a risk assessment framework for understanding how potential responses to dam removal vary...
15 pp. Maps, tables, references. T20S R7E, Section 35 NW 1/4. Captured May 17, 2007.Proposes to im...
A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate f...
BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan t...