International audienceThis paper evaluates the opportunity and efficiency to introduce a two-part tariff to coordinate the location of power plants with lumpy transmission investments. Nodal pricing sends the short run component of such a two-part tariff and we study the case where the average participation tariff sends the long run one. We argue that this solution is helpful because the average participation tariff tackles lumpiness of transmission capacity while being as cost-reflective as possible. Our proposition is evaluated based on a double optimization model where a TSO minimizes the transmission cost while a generator minimizes its own cost that may take into account network constraints and include the average participation tariff....