JACoW web site http://accelconf.web.cern.ch/AccelConf/e06The SPIRAL-2 superconducting linac driver, which aims to deliver 5 mA, 20 A.MeV deuterons and 1 mA, 14.5 A.MeV q/A=1/3 heavy ions, is now entering the construction phase. It is composed of an injector composed of two ECR sources entering a 88 MHz RFQ, followed by a superconducting section based on independently phased quarter-wave cavities with warm focusing. This paper presents the status of the beam dynamics studies recently performed during this construction phase: consolidation and freezing of the linac design, update of the mass separation system or analysis of the proton capability