The robust and rapid clinical effect of depleting anti-CD20 monoclonal antibodies (mAb) in multiple sclerosis (MS) demonstrates a critical pathogenic contribution of B cells. The clinical effect of anti-CD20 mAb has been replicated in a relevant preclinical MS model, experimental autoimmune encephalomyelitis (EAE) in marmoset monkeys (Callithrix jacchus). By contrast, treatment with mAbs against two essential cytokines in B cell activation growth and survival, i.e. BlyS/BAFF and APRIL, was only partially effective. All three mAbs induced depletion of CD20+B cells from the circulation, albeit with different kinetics and based on distinct mechanisms of action. In the current study we analyzed whether the different clinical effect of anti-CD20...