The "POWER - PLANT" deals with the rehabilitation of the former Central Power Conversion and Dale Schoeller (Nejedly I and III) in the village Libušín Mine. Will be newly designed for building the power plant technology with progressive fluidized bed boiler to biomass steam turbine with an output of 7 MW and absorption (trigeneration) unit producing heat, cooling and electricity, which also will function as a cooler primary circuits. The source of water for the power plant will not only former mining pit Nejedlý I which is currently flooded drinking water at about 12 ° C. This system uses high efficiency embedded fuel (biomass), which is ultimately required less. A greater proportion of electricity generated and part of the heat will be dis...