The small-strip Thin-Gap Chambers (sTGC) will be used as both trigger and precision tracking muon detectors for the Phase-I upgrade of the ATLAS New Small Wheel (NSW) muon detector. Signals from both the sTGC pad and strip detectors will be first read out by the Amplifier-Shaper-Discriminator (ASD) chip designed by the Brookhaven National Laboratory, and then collected and transmitted by a Trigger Data Serializer (TDS) chip at a rate of 4.8 Gbps to other related circuits. The pad-TDS chip checks the presence of pad hits and sends the information together with Bunching Crossing ID to the pad-trigger logic to define roads of interest. The strip-TDS chip collects and buffers strip charge information and transmits a range of strips within the r...
The Phase-I and Phase-II upgrades of the LHC accelerator will increase the LHC instantaneous luminos...
The ATLAS experiment will be upgraded during the next LHC Long Shutdown (LS2). The flagship upgrade ...
An ASIC has been fabricated in order to readout data from an MWPC that is installed in high rate env...
The small-strip Thin-Gap Chambers (sTGC) will be used as both trigger and precision tracking muon de...
A small-strip thin gap chamber (sTGC) will be used for both triggering and precision tracking purpos...
The ATLAS New Small Wheel (NSW), comprising MicroMegas (MMs) and small-strip Thin Gap Chambers (sTGC...
The present small wheel muon detector at ATLAS will be replaced with a New Small Wheel (NSW) detecto...
The largest phase-1 upgrade project for the ATLAS Muon System is the replacement of the present firs...
We report on the design of a serializer ASIC to be used in the ATLAS forward muon detector for trigg...
Abstract– The New Small Wheel (NSW) small-strip thin-gap chambers (sTGC) detector will be installed ...
The upgrades of the LHC accelerator and the experiments in 2019/20 and 2023/24 will increase the ins...
We describe the upgrade of the ATLAS forward Level 1 (L1) muon trigger planned for the LHC run with ...
The upgrades of the LHC accelerator and the experiments in 2019/20 and 2023/24 will increase the ins...
This paper presents a readout system designed for testing the prototype of Small-Strip Thin Gap Cham...
The Phase-I and Phase-II upgrades of the LHC accelerator will increase the LHC instantaneous luminos...
The Phase-I and Phase-II upgrades of the LHC accelerator will increase the LHC instantaneous luminos...
The ATLAS experiment will be upgraded during the next LHC Long Shutdown (LS2). The flagship upgrade ...
An ASIC has been fabricated in order to readout data from an MWPC that is installed in high rate env...
The small-strip Thin-Gap Chambers (sTGC) will be used as both trigger and precision tracking muon de...
A small-strip thin gap chamber (sTGC) will be used for both triggering and precision tracking purpos...
The ATLAS New Small Wheel (NSW), comprising MicroMegas (MMs) and small-strip Thin Gap Chambers (sTGC...
The present small wheel muon detector at ATLAS will be replaced with a New Small Wheel (NSW) detecto...
The largest phase-1 upgrade project for the ATLAS Muon System is the replacement of the present firs...
We report on the design of a serializer ASIC to be used in the ATLAS forward muon detector for trigg...
Abstract– The New Small Wheel (NSW) small-strip thin-gap chambers (sTGC) detector will be installed ...
The upgrades of the LHC accelerator and the experiments in 2019/20 and 2023/24 will increase the ins...
We describe the upgrade of the ATLAS forward Level 1 (L1) muon trigger planned for the LHC run with ...
The upgrades of the LHC accelerator and the experiments in 2019/20 and 2023/24 will increase the ins...
This paper presents a readout system designed for testing the prototype of Small-Strip Thin Gap Cham...
The Phase-I and Phase-II upgrades of the LHC accelerator will increase the LHC instantaneous luminos...
The Phase-I and Phase-II upgrades of the LHC accelerator will increase the LHC instantaneous luminos...
The ATLAS experiment will be upgraded during the next LHC Long Shutdown (LS2). The flagship upgrade ...
An ASIC has been fabricated in order to readout data from an MWPC that is installed in high rate env...