This plan contemplates the addition of approximately 2,000 c.f.s to the proposed East Side Division conveyance facilities from the Sacramento River via the Hood-Clay pump connection and thence through the East Side Canal facilities to the Kern River. From that location, a new 2,000-c.f.s. canal would be constructed to connect with the California Aqueduct at Wheeler Ridge Pumping Plant No. 1. These proposed facilities are shown in plan and profile on plate 4. The Pacific Southwest Water Plan proposes to enlarge only the Hood-Clay Pump Connection and the East Side Division primary conveyance facility, the East Side Canal from the Hood-Clay Pump Connection to Kern River near Bakersfield. No enlargement would be made of any of the proposed Eas...