Feasibility studies by the Bureau of Reclamation have been completed to the point of definitely establishing the engineering and financial feasibility and layout of the basic East Side Division, but the final feasibility report has not yet been submitted, and only reconnaissance-grade designs and estimates have been made for the Initial Plan enlargement and extension to Wheeler Ridge. The opportunity exists for worthwhile cost savings to both the East Side development and the Pacific Southwest Plan through incorporation of the proposed enlargement. However, the need for additional water in the East Side Division is urgent, and the proposed East Side development has widespread and unified support within the San Joaquin Valley. The additiona...