CHAPTER II PLAN OF DEVELOPMENT The Bridge Canyon Project is planned to produce peaking power and energy which will be required by commercial loads in the Lower Colorado River Basin power market area, and to supply a portion of the power and energy to the water-pumping projects of the Pacific Southwest Water Plan. The powerplant would be interconnected with other hydroelectric plants on the Colorado River, and its output would be integrated with generation from these other installations. The commercial peaking power and energy available from Bridge Canyon would be utilized to meet the expanding power demands of the area and to earn revenues for a basin account which may be used to provide financial assistance for development necessary to a...