Includes time schedule.Revision of a memo originally composed January 27, 1955.The second central computer evaluation test was to take place on March 18, 1955. During this test, special emphasis was to be placed on testing the memory. Less shock test was to be done. Otherwise, the test was to be the same as the first central computer evaluation test
MTC will go on two shift operation next week due to heavy demand for test time. The computer will be...
Includes: foreword; six months' review (and abstract); system engineering, operation of the computer...
Present: D. Brown, R. Everett, J. Forrester, H. Grosch, W. Hosier, J. Hughes, J. Jacobs, R. Jeffrey,...
Includes: introduction and outline of tests.This memorandum represents an expansion of 6M-3271 "XD-1...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, B. E. Morris, W. N....
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Includes: physical and logical status of XD-1; reliability; margins and margin history; shock tests;...
Present: D. R. Brown, J. D. Crane, R. R. Everett, J. W. Forrester, R. G. Farmer, W. A. Hosier, R. Hu...
The nature and purpose of evaluation tests performed on XD-1 and its associated equipment was outlin...
This is the first of a series of M-notes describing procedures, programs, and results of MTC tests o...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, W. Linvill, B. E. M...
Memorandum on estimates regarding time and personnel required for the work leading up to the product...
MTC will go on two shift operation next week due to heavy demand for test time. The computer will be...
Includes: foreword; six months' review (and abstract); system engineering, operation of the computer...
Present: D. Brown, R. Everett, J. Forrester, H. Grosch, W. Hosier, J. Hughes, J. Jacobs, R. Jeffrey,...
Includes: introduction and outline of tests.This memorandum represents an expansion of 6M-3271 "XD-1...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, B. E. Morris, W. N....
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Includes: physical and logical status of XD-1; reliability; margins and margin history; shock tests;...
Present: D. R. Brown, J. D. Crane, R. R. Everett, J. W. Forrester, R. G. Farmer, W. A. Hosier, R. Hu...
The nature and purpose of evaluation tests performed on XD-1 and its associated equipment was outlin...
This is the first of a series of M-notes describing procedures, programs, and results of MTC tests o...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, W. Linvill, B. E. M...
Memorandum on estimates regarding time and personnel required for the work leading up to the product...
MTC will go on two shift operation next week due to heavy demand for test time. The computer will be...
Includes: foreword; six months' review (and abstract); system engineering, operation of the computer...
Present: D. Brown, R. Everett, J. Forrester, H. Grosch, W. Hosier, J. Hughes, J. Jacobs, R. Jeffrey,...