Building no. 83. Constructed in 1867. Although the hospital was occupied by 1 May 1869, it was not completed until 1871. It took 1,800 mules, 1,300 civilian employees, and over one million bricks to build the Post Hospital for the Army post. The architectural firm of Bell, Klein and Hoffman, in their Preservation Master Plan for the Old Fort Brown Buildings (1981), observed that three additions appeared to have been made to the hospital. These additions included the two-story tower adjoined to the east wing by a one-story infill and the two-story blocks at the rear. However, a 1869 map shows a “T” form representing the hospital which might indicate that only the far rear block was not present. Post Inventory and Post Engineers Records o...