This talk summarizes the status and the plan of the deliverable D15.2 of the Work Package 15.3 within the EU AIDA-2020 project
On January 17th 2018, a forum on a possible Joint Research Activity on a future common Beam Telescop...
DESY Hamburg operates a test beam facility with three independent beam lines at the DESY II synchrot...
This document describes the DESY II test beam facility available for the winning teams of the Beamli...
This talk reports the latest status of the two tasks of the WP15.3 within the EU AIDA-2020 project
The DESY II Test Beam Facility provides user groups with three test beams of several kiloelectrons p...
AIDA-2020 is an EU-funded project about Advanced European Infrastructures for Detectors at Accelerat...
The DESY II Test Beam Facility will resume operations mid February 2018. The current status and poss...
This note is a technical support to the Deliverable D15.3: Environmental Control System at DESY, pro...
A new telescope, LYCORIS (Large area x-Y COverage Readout Integrated Strip telescope), is being buil...
The DESY II Test Beam Facility will resume operations in February 2017 The current status and the re...
The DESY II Test Beam Facility is one of few facilities around the world capable of providing multi ...
As an ‘upgrade of beam and irradiation test infrastructure’ within the EU AIDA2020 project, an envir...
We are developing SiW-ECAL technological prototypes with the aim of optimizing readout structure for...
Section 5 of this Report covers the subject of Deliverable 8.3 (Advances in beam diagnostics for 3rd...
This document is motivated by the need of clarification of possible interference between the operati...
On January 17th 2018, a forum on a possible Joint Research Activity on a future common Beam Telescop...
DESY Hamburg operates a test beam facility with three independent beam lines at the DESY II synchrot...
This document describes the DESY II test beam facility available for the winning teams of the Beamli...
This talk reports the latest status of the two tasks of the WP15.3 within the EU AIDA-2020 project
The DESY II Test Beam Facility provides user groups with three test beams of several kiloelectrons p...
AIDA-2020 is an EU-funded project about Advanced European Infrastructures for Detectors at Accelerat...
The DESY II Test Beam Facility will resume operations mid February 2018. The current status and poss...
This note is a technical support to the Deliverable D15.3: Environmental Control System at DESY, pro...
A new telescope, LYCORIS (Large area x-Y COverage Readout Integrated Strip telescope), is being buil...
The DESY II Test Beam Facility will resume operations in February 2017 The current status and the re...
The DESY II Test Beam Facility is one of few facilities around the world capable of providing multi ...
As an ‘upgrade of beam and irradiation test infrastructure’ within the EU AIDA2020 project, an envir...
We are developing SiW-ECAL technological prototypes with the aim of optimizing readout structure for...
Section 5 of this Report covers the subject of Deliverable 8.3 (Advances in beam diagnostics for 3rd...
This document is motivated by the need of clarification of possible interference between the operati...
On January 17th 2018, a forum on a possible Joint Research Activity on a future common Beam Telescop...
DESY Hamburg operates a test beam facility with three independent beam lines at the DESY II synchrot...
This document describes the DESY II test beam facility available for the winning teams of the Beamli...