The DESY II Test Beam Facility will resume operations in February 2017 The current status and the recent improvements and enhancements of the facility will be presented
The SINBAD facility (Short INnovative Bunches and Accelerators at DESY) is a long-term dedicated acc...
As part of the AIDA2020 project, a new large area strip beam telescope is being developed. It has -i...
This talk reports the latest status of the two tasks of the WP15.3 within the EU AIDA-2020 project
The DESY II Test Beam Facility will resume operations mid February 2018. The current status and poss...
The DESY II electron testbeam facility will be presented including the available infrastructure
The DESY II Test Beam Facility provides user groups with three test beams of several kiloelectrons p...
DESY Hamburg operates a test beam facility with three independent beam lines at the DESY II synchrot...
The DESY II Test Beam Facility is one of few facilities around the world capable of providing multi ...
This document describes the DESY II test beam facility available for the winning teams of the Beamli...
This talk presents the work of constructing a new beam telescope using a innovative hybrid-less stri...
As an ‘upgrade of beam and irradiation test infrastructure’ within the EU AIDA2020 project, an envir...
The DESY II Test Beam Facility is a key infrastructure for modern high energy physics detector devel...
The foreseen Large Hadron Collider upgrade is expected to deliver an integrated luminosity that is o...
A new injection system is under development for the LINAC II at DESY to improve the reliability of t...
This document is motivated by the need of clarification of possible interference between the operati...
The SINBAD facility (Short INnovative Bunches and Accelerators at DESY) is a long-term dedicated acc...
As part of the AIDA2020 project, a new large area strip beam telescope is being developed. It has -i...
This talk reports the latest status of the two tasks of the WP15.3 within the EU AIDA-2020 project
The DESY II Test Beam Facility will resume operations mid February 2018. The current status and poss...
The DESY II electron testbeam facility will be presented including the available infrastructure
The DESY II Test Beam Facility provides user groups with three test beams of several kiloelectrons p...
DESY Hamburg operates a test beam facility with three independent beam lines at the DESY II synchrot...
The DESY II Test Beam Facility is one of few facilities around the world capable of providing multi ...
This document describes the DESY II test beam facility available for the winning teams of the Beamli...
This talk presents the work of constructing a new beam telescope using a innovative hybrid-less stri...
As an ‘upgrade of beam and irradiation test infrastructure’ within the EU AIDA2020 project, an envir...
The DESY II Test Beam Facility is a key infrastructure for modern high energy physics detector devel...
The foreseen Large Hadron Collider upgrade is expected to deliver an integrated luminosity that is o...
A new injection system is under development for the LINAC II at DESY to improve the reliability of t...
This document is motivated by the need of clarification of possible interference between the operati...
The SINBAD facility (Short INnovative Bunches and Accelerators at DESY) is a long-term dedicated acc...
As part of the AIDA2020 project, a new large area strip beam telescope is being developed. It has -i...
This talk reports the latest status of the two tasks of the WP15.3 within the EU AIDA-2020 project