The paper presents a structural appraisal of a reinforced concrete water tower at the Public Abattoir in Malta. The water tower was constructed in the first half of the 20th century and consists in a reinforced concrete thin shell structure supported on twelve columns. Detailed drawings and a refined 3D model were prepared based on detailed site measurements of the structure. The concrete was assessed through non-destructive tests and with reference to extracted concrete core samples from different parts of the structure and extracted steel reinforcement samples. Detailed deterioration mapping was conducted for the entire structure. This data was used to model the structure and analyse it through finite element models intended to determine ...
In Sweden, there are many assets for drinking water such as water towers, water treatment plants and...
Reinforced concrete has been a widely used material for the construction of buildings for many decad...
The author was given the chance to be a part of the VNRV-L&S Building project. He was assigned in on...
The paper presents a structural appraisal of a reinforced concrete water tower at the Public Abattoi...
AbstractThe purpose of this work was to define the technical condition of the water tower building a...
The period of 1950 – 1980 was most intensive for water – supply towers construction in Lithuania. Th...
The period of 1950 – 1980 was most intensive for water – supply towers construction in Lithuania. Th...
Water tanks are elements of strategic infrastructure in the context of major earthquakes and must be...
This paper shows how the corrosion and mechanical actions can be taken into account in a simple mode...
A reinforced concrete structure constructs a combination of concrete and steel bars. Structures are ...
Vandentiekio bokštai naudojami agresyvioje aplinkoje, kur juos veikia įvairūs fiziniai ir cheminiai ...
The buildings are built as the public during ertain life time. But during his maid, buildings vulner...
The work deals with design of load-bearing structure of watertower. The solution include design and ...
Abstract:- Storage reservoirs and overhead tank are used to store water, liquid petroleum, petroleum...
Vandentiekio bokštų (toliau – VB) konstrukcijos veikiamos apkrovų ir neigiamo aplinkos poveikio nudė...
In Sweden, there are many assets for drinking water such as water towers, water treatment plants and...
Reinforced concrete has been a widely used material for the construction of buildings for many decad...
The author was given the chance to be a part of the VNRV-L&S Building project. He was assigned in on...
The paper presents a structural appraisal of a reinforced concrete water tower at the Public Abattoi...
AbstractThe purpose of this work was to define the technical condition of the water tower building a...
The period of 1950 – 1980 was most intensive for water – supply towers construction in Lithuania. Th...
The period of 1950 – 1980 was most intensive for water – supply towers construction in Lithuania. Th...
Water tanks are elements of strategic infrastructure in the context of major earthquakes and must be...
This paper shows how the corrosion and mechanical actions can be taken into account in a simple mode...
A reinforced concrete structure constructs a combination of concrete and steel bars. Structures are ...
Vandentiekio bokštai naudojami agresyvioje aplinkoje, kur juos veikia įvairūs fiziniai ir cheminiai ...
The buildings are built as the public during ertain life time. But during his maid, buildings vulner...
The work deals with design of load-bearing structure of watertower. The solution include design and ...
Abstract:- Storage reservoirs and overhead tank are used to store water, liquid petroleum, petroleum...
Vandentiekio bokštų (toliau – VB) konstrukcijos veikiamos apkrovų ir neigiamo aplinkos poveikio nudė...
In Sweden, there are many assets for drinking water such as water towers, water treatment plants and...
Reinforced concrete has been a widely used material for the construction of buildings for many decad...
The author was given the chance to be a part of the VNRV-L&S Building project. He was assigned in on...