2000PDFTech ReportGAO/T-RCED-00-294Air qualityCostsDamsElectric powerFresh waterIrrigation canalsSedimentsAir qualityCost estimatesDamsElectric powerEnvironmental impact statementsFederal lawFresh waterGAO reportsHabitatsHydroelectricityInfrastructureIrrigation systemsSedimentsSnake RiverUnited StatesUnited States. General Accounting OfficeStewart, Derek B.United States. General Accounting OfficeUnited States. Army. Corps of EngineersUS Transportation CollectionIn December 1999, the Corps released its draft EIS assessing the biological, environmental, economic, and social consequences of breaching the four dams and of the other three alternatives. The draft EIS, which cost more than $22 million to prepare, made ;Testimony before the Subcomm...
textThis report is a case study of the Environmental Impact Statement (EIS) that was prepared by th...
The USIBWC anticipates a need for changes in current operation and maintenance of the Tijuana River ...
This report outlines the agency’s organization, project development process, civil works appropriati...
Testimony issued by the General Accounting Office with an abstract that begins "Pursuant to a congre...
The Lower Colorado River Basin Study was conducted in response to authorization from the Congress of...
The passage of the National Environmental Policy Act on January 1, 1970, required all federal agenci...
The U.S. Army Corps of Engineers attracts congressional attention because its projects can have sign...
A letter report issued by the General Accounting Office with an abstract that begins "The U.S. Army ...
The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draini...
Provides an overview of how the U.S. Army Corps of Engineers has influenced historical and contempor...
This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmi...
The Army Corps of Engineers (Corps) operates a system of six dams and reservoirs on the Missouri Riv...
Since the 1930`s, the Columbia River has been harnessed for the benefit of the Northwest and the nat...
A letter report issued by the Government Accountability Office with an abstract that begins "For mor...
BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan t...
textThis report is a case study of the Environmental Impact Statement (EIS) that was prepared by th...
The USIBWC anticipates a need for changes in current operation and maintenance of the Tijuana River ...
This report outlines the agency’s organization, project development process, civil works appropriati...
Testimony issued by the General Accounting Office with an abstract that begins "Pursuant to a congre...
The Lower Colorado River Basin Study was conducted in response to authorization from the Congress of...
The passage of the National Environmental Policy Act on January 1, 1970, required all federal agenci...
The U.S. Army Corps of Engineers attracts congressional attention because its projects can have sign...
A letter report issued by the General Accounting Office with an abstract that begins "The U.S. Army ...
The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draini...
Provides an overview of how the U.S. Army Corps of Engineers has influenced historical and contempor...
This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmi...
The Army Corps of Engineers (Corps) operates a system of six dams and reservoirs on the Missouri Riv...
Since the 1930`s, the Columbia River has been harnessed for the benefit of the Northwest and the nat...
A letter report issued by the Government Accountability Office with an abstract that begins "For mor...
BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan t...
textThis report is a case study of the Environmental Impact Statement (EIS) that was prepared by th...
The USIBWC anticipates a need for changes in current operation and maintenance of the Tijuana River ...
This report outlines the agency’s organization, project development process, civil works appropriati...