The brick walls of the first permanent building for St. Luke\u27s Lutheran Church go up and the roof is framed. 1938-39. 8x10 black & white print. Scanned on Epson 10000XL at SLLC, 2011.https://stars.library.ucf.edu/cfm-images/1177/thumbnail.jp
Photos taken, c. 1992, during the construction of St. Luke\u27s new church facility. The images show...
Exterior views of St. Luke\u27s Lutheran church, showing the north transept, added (along with anoth...
As construction progressed, the outlines of the architectural design (which would join the new facil...
The brick walls of the first permanent building for St. Luke\u27s Lutheran Church go up and the roof...
Workmen on scaffolding and ladders are busy with the construction of the new brick church, the first...
Roof timbers are applied and the bell tower is built up as construction continues on the new brick c...
The exterior of the new brick church is now complete and the St. Luke\u27s congregation can soon beg...
Framing for the unusual roof line designed for St. Luke\u27s new church facility begins after the co...
The south side of the brick church, under construction (1938-39)and the partially completed bell tow...
Photos taken, c. 1992, during the construction of St. Luke\u27s new church facility. The images show...
Exterior views of St. Luke\u27s Lutheran church, showing the north transept, added (along with anoth...
As construction progressed, the outlines of the architectural design (which would join the new facil...
The brick walls of the first permanent building for St. Luke\u27s Lutheran Church go up and the roof...
Workmen on scaffolding and ladders are busy with the construction of the new brick church, the first...
Roof timbers are applied and the bell tower is built up as construction continues on the new brick c...
The exterior of the new brick church is now complete and the St. Luke\u27s congregation can soon beg...
Framing for the unusual roof line designed for St. Luke\u27s new church facility begins after the co...
The south side of the brick church, under construction (1938-39)and the partially completed bell tow...
Photos taken, c. 1992, during the construction of St. Luke\u27s new church facility. The images show...
Exterior views of St. Luke\u27s Lutheran church, showing the north transept, added (along with anoth...
As construction progressed, the outlines of the architectural design (which would join the new facil...