This is the third report of observations and operations pertaining to a concrete pavement without the usual transverse joints constructed in the summer of 1949. Report No. 2 which was presented to the Research Committee December, 1949, contained a detailed description of the project, pictures of the class of cracking described, a record of the crack filling operation to December, 1949, and three crack survey reports with a strip map of the project. The purpose of this report is to present three additional crack surveys taken in 1950 with the additional crack filling operations up to this time. All of the ungrooved cracks were cut out and filled with various types of fillers late in the past year, so that this type of treatment has been exte...
PDFTech ReportLADOTD/FHWA/06-411736-99-1022Concrete pavementsTransverse jointsUnreinforced concreteC...
2017Distribution number: HRDI-30/09-17(WEB)PDFTech ReportFHWA-HRT-16-073Concrete pavementsJoints (En...
A complete survey of the above project was made between April 27, and May 13, of this year to deter ...
This is the third report of observations and operations pertaining to a concrete pavement without th...
This is a report of observations and operations pertaining to a concrete pavement without the usual ...
This is a report of observations and operations pertaining to a concrete pavement without the usual ...
This project was last reported in January, 1951, or approximately two years ago. Three previous repo...
For a period of more than six years the Research Division has had under observation the concrete pav...
In 1949, a 5.737-mile section of portland cement concrete pavement was constructed without the inclu...
In order to aid in a final determination of a rational, economical, and practical jointing method fo...
A sampling-type crack survey was made in July 1969; 200 feet in each 1000 feet were sampled. The ave...
In 1940, the Kentucky Department of Highways constructed an experimental concrete pavement which was...
213330575Progress rept. no. 1.PDFTech ReportVHRC 72-R8Cracking of concrete pavementsVirginiaVirginia...
Combined in this report are descriptions of the progress of three individual experimental joint inst...
The objective of this study was to monitor placement and evaluate performance of continuously reinfo...
PDFTech ReportLADOTD/FHWA/06-411736-99-1022Concrete pavementsTransverse jointsUnreinforced concreteC...
2017Distribution number: HRDI-30/09-17(WEB)PDFTech ReportFHWA-HRT-16-073Concrete pavementsJoints (En...
A complete survey of the above project was made between April 27, and May 13, of this year to deter ...
This is the third report of observations and operations pertaining to a concrete pavement without th...
This is a report of observations and operations pertaining to a concrete pavement without the usual ...
This is a report of observations and operations pertaining to a concrete pavement without the usual ...
This project was last reported in January, 1951, or approximately two years ago. Three previous repo...
For a period of more than six years the Research Division has had under observation the concrete pav...
In 1949, a 5.737-mile section of portland cement concrete pavement was constructed without the inclu...
In order to aid in a final determination of a rational, economical, and practical jointing method fo...
A sampling-type crack survey was made in July 1969; 200 feet in each 1000 feet were sampled. The ave...
In 1940, the Kentucky Department of Highways constructed an experimental concrete pavement which was...
213330575Progress rept. no. 1.PDFTech ReportVHRC 72-R8Cracking of concrete pavementsVirginiaVirginia...
Combined in this report are descriptions of the progress of three individual experimental joint inst...
The objective of this study was to monitor placement and evaluate performance of continuously reinfo...
PDFTech ReportLADOTD/FHWA/06-411736-99-1022Concrete pavementsTransverse jointsUnreinforced concreteC...
2017Distribution number: HRDI-30/09-17(WEB)PDFTech ReportFHWA-HRT-16-073Concrete pavementsJoints (En...
A complete survey of the above project was made between April 27, and May 13, of this year to deter ...