This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln School dams
This design memorandum presents the results of current engineering and economic analyses which serve...
This report summarizes the results of system planning, environmental, and location studies for trans...
The Final Impact Statement is supported by all appendices from all drafts as well as supplementary i...
This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections...
The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey ...
This design memorandum presents the results of several studies undertaken to provide an understandin...
This design memorandum presents for review the revised general plan and data for the Dickey-Lincoln ...
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immed...
The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on...
The Dickey-Lincoln School Project would consist of two earthfill structures designed to produce peak...
The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reac...
The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natu...
An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federall...
This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lin...
Plans to mitigate wildlife habitat and fisheries losses resulting from construction of the proposed ...
This design memorandum presents the results of current engineering and economic analyses which serve...
This report summarizes the results of system planning, environmental, and location studies for trans...
The Final Impact Statement is supported by all appendices from all drafts as well as supplementary i...
This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections...
The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey ...
This design memorandum presents the results of several studies undertaken to provide an understandin...
This design memorandum presents for review the revised general plan and data for the Dickey-Lincoln ...
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immed...
The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on...
The Dickey-Lincoln School Project would consist of two earthfill structures designed to produce peak...
The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reac...
The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natu...
An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federall...
This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lin...
Plans to mitigate wildlife habitat and fisheries losses resulting from construction of the proposed ...
This design memorandum presents the results of current engineering and economic analyses which serve...
This report summarizes the results of system planning, environmental, and location studies for trans...
The Final Impact Statement is supported by all appendices from all drafts as well as supplementary i...