The victim was preparing a mine for demolition in the middle of the second working lane when then the accident occurred at 11:30. He had a trowel and shears with him at the time of the accident. The handle of the trowel was separated horizontally and was burned. A prodder was found to the right of the crater. He received many injuries to the head, to both legs and arms . He showed no sign of life when reached by other deminers
The victim initiated a mine at 13:10 while he was prodding to investigate a detector reading. His vi...
The accident had taken place at 1245hrs; the injured deminer arrived at Emergency hospital in Sulyma...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
The accident occurred at 11:15 in an area that was undulating and steep with dry earth and rock. The...
From the site examination, the investigators decided that the victim knelt on his base stick and ini...
The accident occurred at the start of the working day when the victim began working in the same lane...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
On 18th Apr 2002 one of our deminers activated a small AP mine while he was excavating the ground. T...
At 16:10 the victim changed roles with his partner and began work. His partner withdrew 30 metres. H...
On 10 April 2007 at 1155 hrs while deminer [the Victim] with employ No. 4094 was working in his clea...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
At 06:55 Hrs one of the deminers of No-3 section [the Victim] while working in lane No-7 hit a mine ...
The team started work at 07:30 and at 09:30 it started to rain so they stopped work. The rain was li...
The victim was carrying out a normal excavation drill at 10:45 when a mine, suspected R2M2…function...
The victim\u27s partner found two PMA-3 mines and the Team Leader disarmed them and put them in a m...
The victim initiated a mine at 13:10 while he was prodding to investigate a detector reading. His vi...
The accident had taken place at 1245hrs; the injured deminer arrived at Emergency hospital in Sulyma...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
The accident occurred at 11:15 in an area that was undulating and steep with dry earth and rock. The...
From the site examination, the investigators decided that the victim knelt on his base stick and ini...
The accident occurred at the start of the working day when the victim began working in the same lane...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
On 18th Apr 2002 one of our deminers activated a small AP mine while he was excavating the ground. T...
At 16:10 the victim changed roles with his partner and began work. His partner withdrew 30 metres. H...
On 10 April 2007 at 1155 hrs while deminer [the Victim] with employ No. 4094 was working in his clea...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
At 06:55 Hrs one of the deminers of No-3 section [the Victim] while working in lane No-7 hit a mine ...
The team started work at 07:30 and at 09:30 it started to rain so they stopped work. The rain was li...
The victim was carrying out a normal excavation drill at 10:45 when a mine, suspected R2M2…function...
The victim\u27s partner found two PMA-3 mines and the Team Leader disarmed them and put them in a m...
The victim initiated a mine at 13:10 while he was prodding to investigate a detector reading. His vi...
The accident had taken place at 1245hrs; the injured deminer arrived at Emergency hospital in Sulyma...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...