During the austral summer of 2006, a record-setting 1 284.87 metre (m)-long rock and sediment core (ANDRILL [AND]-1B) was recovered from beneath the McMurdo Ice Shelf (MIS) in 917m of water. A custom built drilling system comprising a UDR-1200 rig, jack-up platform, hot water drill, sea riser, and diamond-bit wireline coring string was set up on the McMurdo Ice Shelf approximately 9 kilometres (km) from Scott Base (NZ). The drilling sytem employed technology developed to handle challenging environmental conditions including an 85 m-thick ice shelf ‘platform’ that moved both laterally and vertically, strong tidal currents, and high winds. Drill site set up commenced on 18 August 2006, and the first core for AND-1B was recovered on 31 October...
The ANDRILL Program successfully recovered a 1285 m-long succession of cyclic glacimarine sediment w...
ANDRILL (ANtarctic geological DRILLing) is a multinational drilling project that is drilling into se...
A comprehensive set of downhole measurements was collected in the AND-1B drillhole as part of the on...
During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRILL [AND]-2A...
Abstract- During the austral summer of 2006, a record-setting 1 284.87 metre (m)-long rock and sedim...
Abstract- During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRIL...
The Antarctic Geological Drilling (ANDRILL) program—a collaboration between Germany, Italy, New Zeal...
The aim of the McMurdo Ice Shelf (MIS) Project was to obtain a continuous sediment core through appr...
ANDRILL (ANtarctic geological DRILLing) is a new international, multi-disciplinary drilling program ...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007;www.ipy....
During the Southern Hemisphere\u27s last summer, between October 29 and December 26, about 80 resear...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007; www.ipy...
The ANDRILL Program successfully recovered a 1285 m-long succession of cyclic glacimarine sediment w...
This section reports preliminary data and results on petrology and geochemistry of AND-1B core
During the Southern Hemisphere’s last summer, between October 29 and December 26, about 80 researche...
The ANDRILL Program successfully recovered a 1285 m-long succession of cyclic glacimarine sediment w...
ANDRILL (ANtarctic geological DRILLing) is a multinational drilling project that is drilling into se...
A comprehensive set of downhole measurements was collected in the AND-1B drillhole as part of the on...
During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRILL [AND]-2A...
Abstract- During the austral summer of 2006, a record-setting 1 284.87 metre (m)-long rock and sedim...
Abstract- During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRIL...
The Antarctic Geological Drilling (ANDRILL) program—a collaboration between Germany, Italy, New Zeal...
The aim of the McMurdo Ice Shelf (MIS) Project was to obtain a continuous sediment core through appr...
ANDRILL (ANtarctic geological DRILLing) is a new international, multi-disciplinary drilling program ...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007;www.ipy....
During the Southern Hemisphere\u27s last summer, between October 29 and December 26, about 80 resear...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007; www.ipy...
The ANDRILL Program successfully recovered a 1285 m-long succession of cyclic glacimarine sediment w...
This section reports preliminary data and results on petrology and geochemistry of AND-1B core
During the Southern Hemisphere’s last summer, between October 29 and December 26, about 80 researche...
The ANDRILL Program successfully recovered a 1285 m-long succession of cyclic glacimarine sediment w...
ANDRILL (ANtarctic geological DRILLing) is a multinational drilling project that is drilling into se...
A comprehensive set of downhole measurements was collected in the AND-1B drillhole as part of the on...