Abstract- During the austral summer of 2006, a record-setting 1 284.87 metre (m)-long rock and sediment core (ANDRILL [AND]-1B) was recovered from beneath the McMurdo Ice Shelf (MIS) in 917 m of water. A custom built drilling system comprising a UDR-1200 rig, jack-up platform, hot water drill, sea riser, and diamond-bit wireline coring string was set up on the McMurdo Ice Shelf approximately 9 kilometres (km) from Scott Base (NZ). The drilling sytem employed technology developed to handle challenging environmental conditions including an 85 m-thick ice shelf ‘platform ’ that moved both laterally and vertically, strong tidal currents, and high winds. Drill site set up commenced on 18 August 2006, an
During the Southern Hemisphere\u27s last summer, between October 29 and December 26, about 80 resear...
Abstract The Rapid Access Ice Drill (RAID) was designed and built to rapidly drill th...
International audienceWe describe a project to retrieve a 948 m deep ice core from Berkner Island, A...
Abstract- During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRIL...
During the austral summer of 2006, a record-setting 1 284.87 metre (m)-long rock and sediment core (...
During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRILL [AND]-2A...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007;www.ipy....
ANDRILL (ANtarctic geological DRILLing) is a new international, multi-disciplinary drilling program ...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007; www.ipy...
The ANtarctic geological DRILLing Program (ANDRILL)is currently a consortium of five nations (German...
ANDRILL (ANtarctic geological DRILLing) is a multinational drilling project that is drilling into se...
During the austral summer of 2007 the ANtarctic DRILLing program (ANDRILL) will drill from a sea-ice...
The Antarctic Geological Drilling (ANDRILL) program—a collaboration between Germany, Italy, New Zeal...
A 45.97m-deep drilling operation was carried out during November/December 1999 on the accumulation a...
The aim of the McMurdo Ice Shelf (MIS) Project was to obtain a continuous sediment core through appr...
During the Southern Hemisphere\u27s last summer, between October 29 and December 26, about 80 resear...
Abstract The Rapid Access Ice Drill (RAID) was designed and built to rapidly drill th...
International audienceWe describe a project to retrieve a 948 m deep ice core from Berkner Island, A...
Abstract- During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRIL...
During the austral summer of 2006, a record-setting 1 284.87 metre (m)-long rock and sediment core (...
During the austral spring of 2007-08, a 1138 metre (m)-long rock and sediment core (ANDRILL [AND]-2A...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007;www.ipy....
ANDRILL (ANtarctic geological DRILLing) is a new international, multi-disciplinary drilling program ...
One of the scientific programs of the Fourth International Polar Year (Allison et al., 2007; www.ipy...
The ANtarctic geological DRILLing Program (ANDRILL)is currently a consortium of five nations (German...
ANDRILL (ANtarctic geological DRILLing) is a multinational drilling project that is drilling into se...
During the austral summer of 2007 the ANtarctic DRILLing program (ANDRILL) will drill from a sea-ice...
The Antarctic Geological Drilling (ANDRILL) program—a collaboration between Germany, Italy, New Zeal...
A 45.97m-deep drilling operation was carried out during November/December 1999 on the accumulation a...
The aim of the McMurdo Ice Shelf (MIS) Project was to obtain a continuous sediment core through appr...
During the Southern Hemisphere\u27s last summer, between October 29 and December 26, about 80 resear...
Abstract The Rapid Access Ice Drill (RAID) was designed and built to rapidly drill th...
International audienceWe describe a project to retrieve a 948 m deep ice core from Berkner Island, A...