Entry created by John H. Herrick February 25, 1985John H. Herrick Archives: Documenting Structures at The Ohio State UniversityThe University Archives has determined that this item is of continuing value to OSU's history.New Chemistry Building is located between 18th Ave. & 19th Ave. and between Buildings 053 & 150. The construction address is 101 W. 19th Ave. The permanent address is 120 W. 18th Ave. Building has not been officially named, Campus Planning records refer to it as "New Chemistry Building." Building is frequently called the "Sawtooth Replacement," and it is so designated on the construction drawings. The name "Sawtooth" refers to the roof design of Units A & B of Building 053, which are being replaced by Building 371