A surface flow bypass takes advantage of the natural surface orientation of most juvenile salmon Oncorhynchus spp. and steelhead O. mykiss by providing a route in the upper water column that downstream migrant fishes can use to pass a hydroelectric dam safely. A prototype structure, called the surface bypass and collector (SBC), was retrofitted on the powerhouse of Lower Granite Dam and was evaluated annually with biotelemetry and hydroacoustic techniques during the 5-year life span of the structure (1996-2000) to determine the entrance configuration that maximized passage efficiency and minimized forebay residence time. The best tested entrance configuration had maximum inflow (99 m(3)/s) concentrated in a single surface entrance (5 m wide...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
In 1998 a behavioral guidance structure (BGS; a steel wall 330m long and 17-24 m deep) was installed...
A surface flow bypass takes advantage of the natural surface orientation of most juvenile salmon Onc...
In spring 1996 and 1997, we studied the prototype surface bypass and collector (SBC) at Lower Granit...
In spring 1996 and 1997, we studied the prototype surface bypass and collector (SBC) at Lower Granit...
A surface bypass collector (SBC) system has been identified as a potential means to improve downstre...
A surface bypass collector (SBC) system has been identified as a potential means to improve downstre...
A surface bypass collector (SBC) system has been identified as a potential means to improve downstre...
Salmon and steelhead runs on the Columbia River and its tributaries have been indecline due to sever...
Salmon and steelhead runs on the Columbia River and its tributaries have been indecline due to sever...
The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory...
Between 1985 and 1994, Chelan County Public Utility District (Chelan) used floatingrotating and pass...
Between 1985 and 1994, Chelan County Public Utility District (Chelan) used floatingrotating and pass...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
In 1998 a behavioral guidance structure (BGS; a steel wall 330m long and 17-24 m deep) was installed...
A surface flow bypass takes advantage of the natural surface orientation of most juvenile salmon Onc...
In spring 1996 and 1997, we studied the prototype surface bypass and collector (SBC) at Lower Granit...
In spring 1996 and 1997, we studied the prototype surface bypass and collector (SBC) at Lower Granit...
A surface bypass collector (SBC) system has been identified as a potential means to improve downstre...
A surface bypass collector (SBC) system has been identified as a potential means to improve downstre...
A surface bypass collector (SBC) system has been identified as a potential means to improve downstre...
Salmon and steelhead runs on the Columbia River and its tributaries have been indecline due to sever...
Salmon and steelhead runs on the Columbia River and its tributaries have been indecline due to sever...
The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory...
Between 1985 and 1994, Chelan County Public Utility District (Chelan) used floatingrotating and pass...
Between 1985 and 1994, Chelan County Public Utility District (Chelan) used floatingrotating and pass...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
New England Power Company constructed downstream passage facilities at theVernon and Bellows Falls H...
In 1998 a behavioral guidance structure (BGS; a steel wall 330m long and 17-24 m deep) was installed...