International audienceThe SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented