The well-established under-frequency load shedding (UFLS) is deemed to be the last of effective remedial measures against a severe frequency decline of a power system. With the ever-increasing size of power systems and the extensive penetration of distributed generators (DGs) in power systems, the problem of developing an optimal UFLS strategy is facing some new challenges. Given this background, an optimal UFLS strategy for a distribution system with DGs and load static characteristics taken into consideration is developed. Based on the frequency and the rate of change of frequency, the presented strategy consists of several basic rounds and a special round. In the basic round, the frequency emergency can be alleviated by quickly shedding ...
One of the biggest challenge for an islanding operation is to sustain the frequency stability. A lar...
It has been prime objective of any power producer and distributor to supply uninterruptible power to...
One of the challenge in islanding operation is to maintain frequency stability when generation is le...
The well-established under-frequency load shedding (UFLS) is deemed to be the last of effective reme...
Udgivelsesdato: AprilSignificant penetration of distributed generation in many distribution systems ...
When a distribution network consisting of Distributed Generations (DGs) is disconnected from upstrea...
The integration of load shedding schemes with mainstream protection in power system networks is vita...
The activation of Under Frequency Load Shedding (UFLS) is the last automated action against the seve...
The Under-Frequency Load Shedding (UFLS) scheme is an emergency measure in place to prevent system c...
This research investigates the positive changes in the system frequency response indicators caused b...
Abstract – The frequency of power system is very sensitive to load changing when operating in island...
The frequency of power system is very sensitive to load changing when operating in islanded mode. Th...
This paper investigates the positive changes in the system frequency response indicators caused by t...
High penetration of distributed generation (DG) in distribution level has open an opportunity for is...
Power system blackouts have been observed increasingly frequent and severe. As an emergency control ...
One of the biggest challenge for an islanding operation is to sustain the frequency stability. A lar...
It has been prime objective of any power producer and distributor to supply uninterruptible power to...
One of the challenge in islanding operation is to maintain frequency stability when generation is le...
The well-established under-frequency load shedding (UFLS) is deemed to be the last of effective reme...
Udgivelsesdato: AprilSignificant penetration of distributed generation in many distribution systems ...
When a distribution network consisting of Distributed Generations (DGs) is disconnected from upstrea...
The integration of load shedding schemes with mainstream protection in power system networks is vita...
The activation of Under Frequency Load Shedding (UFLS) is the last automated action against the seve...
The Under-Frequency Load Shedding (UFLS) scheme is an emergency measure in place to prevent system c...
This research investigates the positive changes in the system frequency response indicators caused b...
Abstract – The frequency of power system is very sensitive to load changing when operating in island...
The frequency of power system is very sensitive to load changing when operating in islanded mode. Th...
This paper investigates the positive changes in the system frequency response indicators caused by t...
High penetration of distributed generation (DG) in distribution level has open an opportunity for is...
Power system blackouts have been observed increasingly frequent and severe. As an emergency control ...
One of the biggest challenge for an islanding operation is to sustain the frequency stability. A lar...
It has been prime objective of any power producer and distributor to supply uninterruptible power to...
One of the challenge in islanding operation is to maintain frequency stability when generation is le...