LQB reviews the plant administrative procedures, as described in the applicant's safety analysis report (SAR). This section of the SAR should describe adminis-trative procedures that provide administrative control over activities that are important to safety for the initial test program and operation of the facility. In general, it is not expected that detailed written procedures will be included in the SAR. The final safety analysis report (SAR) should provide descriptions as to the nature and content of procedures as detailed below. No information is required in the preliminary safety analysis report. The Procedures and Text Review Branch (PTRB) reviews testing and operational procedures as described in SRP Section 13.5.2. A. Adminis...
Information describing the reactor containment leakage testing program is reviewed b
The areas of review include all the safety-related interfaces important to the staff review for safe...
The applicant's assessment of possible hazards due.to missiles generated by the design basis to...
The applicant's training program for the non-licensed plant staff, as described in the Safety A...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The following areas of the applicant's safety analysis report (SAR) are reviewed as they relate...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The applicant's identification of potential accident situations in the vicinity of the plant is...
The staff reviews the applicant's assessment of aircraft hazards. The purpose of the review is ...
The applicant's emergency planning, as described in his Safety Analysis Report (SAR), is review...
This Standard Review Plan (SRP), NUREG-0800, has been prepared to establish criteria that the U.S. N...
Information describing the reactor containment leakage testing program is reviewed b
The areas of review include all the safety-related interfaces important to the staff review for safe...
The applicant's assessment of possible hazards due.to missiles generated by the design basis to...
The applicant's training program for the non-licensed plant staff, as described in the Safety A...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The following areas of the applicant's safety analysis report (SAR) are reviewed as they relate...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The applicant's identification of potential accident situations in the vicinity of the plant is...
The staff reviews the applicant's assessment of aircraft hazards. The purpose of the review is ...
The applicant's emergency planning, as described in his Safety Analysis Report (SAR), is review...
This Standard Review Plan (SRP), NUREG-0800, has been prepared to establish criteria that the U.S. N...
Information describing the reactor containment leakage testing program is reviewed b
The areas of review include all the safety-related interfaces important to the staff review for safe...
The applicant's assessment of possible hazards due.to missiles generated by the design basis to...