staff responsible for the review of applications to construct and operate nuclear power plants intends to use in evaluating whether an applicant/licensee meets the NRC's regulations. The Standard Review Plan is not a substitute for the NRC's regulations, and compliance with it is not required. However, an applicant is required to identify differences between the design features, analytical techniques, and procedural measures proposed for its facility and the SRP acceptance criteria and evaluate how the proposed alternatives to the SRP acceptance criteria provide an acceptable method of complying with the NRC regulations. The standard review plan sections are numbered in accordance with corresponding sections in Regulatory Guide 1....
For the licensing of the current fleet of commercial nuclear power plants (NPPs), the Nuclear Regula...
The purpose of this document is to provide the reviewer of a request for a sealed source or device s...
The U.S. Nuclear Regulatory Commission's Standard Review Plan, NUREG4)800, prepared by the Offi...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
This Standard Review Plan (SRP), NUREG-0800, has been prepared to establish criteria that the U.S. N...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The areas of review include all the safety-related interfaces important to the staff review for safe...
Commission contain technical specifications that set forth the limits, operating conditions, and oth...
The Standard Review Plan (SRP) (Reference 2), provides guidance to the regulatory staff of the Nucle...
supplement the acceptance criteria established in Commission regulations and the guidelines provided...
NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who revi...
LQB reviews the plant administrative procedures, as described in the applicant's safety analysi...
Volumes 1 and 2 of this report are a partial response to the requirements of Item I.B.1.1 of the ''N...
Standard Review Plan, NUREGOSOG, prepared by the Office of Nuclear Reactor Regulation, is available ...
For the licensing of the current fleet of commercial nuclear power plants (NPPs), the Nuclear Regula...
The purpose of this document is to provide the reviewer of a request for a sealed source or device s...
The U.S. Nuclear Regulatory Commission's Standard Review Plan, NUREG4)800, prepared by the Offi...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
This Standard Review Plan (SRP), NUREG-0800, has been prepared to establish criteria that the U.S. N...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The areas of review include all the safety-related interfaces important to the staff review for safe...
Commission contain technical specifications that set forth the limits, operating conditions, and oth...
The Standard Review Plan (SRP) (Reference 2), provides guidance to the regulatory staff of the Nucle...
supplement the acceptance criteria established in Commission regulations and the guidelines provided...
NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who revi...
LQB reviews the plant administrative procedures, as described in the applicant's safety analysi...
Volumes 1 and 2 of this report are a partial response to the requirements of Item I.B.1.1 of the ''N...
Standard Review Plan, NUREGOSOG, prepared by the Office of Nuclear Reactor Regulation, is available ...
For the licensing of the current fleet of commercial nuclear power plants (NPPs), the Nuclear Regula...
The purpose of this document is to provide the reviewer of a request for a sealed source or device s...
The U.S. Nuclear Regulatory Commission's Standard Review Plan, NUREG4)800, prepared by the Offi...