Process Pursuant to 10 CFR 50.90, Detroit Edison hereby requests an amendment to the Technical Specifications (TS) for Fermi, Unit 2. The proposed amendment would modify TS requirements for mode change limitations in Limiting Condition for Operation (LCO) 3.0.4 and Surveillance Requirement (SR) 3.0.4. Attachment 1 provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Attachment 2 provides the existing TS pages marked up to show the proposed change. Attachment 3 provides revised (clean) TS pages. Attachment 4 provides the existing TS Bases pages (for information only) marked up to show the proposed change. Detroit Edison requests approval of the proposed License Amendmen...
On July 9, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
Ameren Missouri implemented the following process for determining which Technical Specification (TS)...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
Energy Duane Arnold) hereby requests a one-time revision to the Technical Specifications (TS) for th...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
requests an the changes DESCRIPTION The proposed amendment revises the Unit Nos. 1 and 2 TS Administ...
The purpose of this letter is for the Nebraska Public Power District (NPPD) to request an amendment ...
an amendment to the above license in the form of changes to the technical specifications. The propos...
proposed changes modify TS Section 3.5.1, "ECCS- Operating, " Surveillance Requirement (SR...
This memorandum describes various technical amendments we intend to adopt as part of this rulemaking...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or ...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Pursuant to 10 CFR 50.90, Tennessee Valley Authority (TVA) is submitting a request for an amendment ...
On July 9, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
Ameren Missouri implemented the following process for determining which Technical Specification (TS)...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
Energy Duane Arnold) hereby requests a one-time revision to the Technical Specifications (TS) for th...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
requests an the changes DESCRIPTION The proposed amendment revises the Unit Nos. 1 and 2 TS Administ...
The purpose of this letter is for the Nebraska Public Power District (NPPD) to request an amendment ...
an amendment to the above license in the form of changes to the technical specifications. The propos...
proposed changes modify TS Section 3.5.1, "ECCS- Operating, " Surveillance Requirement (SR...
This memorandum describes various technical amendments we intend to adopt as part of this rulemaking...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or ...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Pursuant to 10 CFR 50.90, Tennessee Valley Authority (TVA) is submitting a request for an amendment ...
On July 9, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
Ameren Missouri implemented the following process for determining which Technical Specification (TS)...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...