Safety Analysis Report (SAR) (Pacific Gas and Electric Company, 2004a). The staff also reviewed documents cited in the SAR, and other relevant publicly available information, including web sites on the Internet. The applicant evaluated off-normal events and accidents associated with the transfer of HI-STAR HB casks from the Refueling Building (RFB) to the proposed Humboldt Bay ISFSI site, lowering of the casks from the transporter to the reinforced concrete storage vault, and interim storage of the casks in the vault. HI-STAR HB cask handling activities inside the RFB fall within the scope of the 10 CFR Part 50 license, and hence, off-normal events and accidents associated with HI-STAR HB cask operations within the RFB were not addressed in...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
This paper discusses a number of topics that relate safety analysis as documented in the Department ...
This report describes the methodology used in conducting the Canister Storage Building (CSB) hazard ...
This chapter of the Safety Evaluation Report (SER) evaluates the descriptions of all operations pres...
The review under this SRP section covers the radiological consequences of the release of fission pro...
(SAR) (Pacific Gas and Electric Company, 2004) provides information about the waste confinement and ...
In this chapter, compliance of the HI-STAR System thermal performance to I OCFR71 requirements is es...
The purpose of this review is to determine the adequacy of the High Flux Beam Reactor (HFBR) Technic...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
The Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR) spent-fuel-element shipping cask ...
The applicant's identification of potential accident situations in the vicinity of the plant is...
CSB reviews the information presented in the applicant's safety analysis report (SAR) concernin...
The purpose of this task (HFBR Restart Activity A2.6) is to perform a review of the design basis acc...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
This paper discusses a number of topics that relate safety analysis as documented in the Department ...
This report describes the methodology used in conducting the Canister Storage Building (CSB) hazard ...
This chapter of the Safety Evaluation Report (SER) evaluates the descriptions of all operations pres...
The review under this SRP section covers the radiological consequences of the release of fission pro...
(SAR) (Pacific Gas and Electric Company, 2004) provides information about the waste confinement and ...
In this chapter, compliance of the HI-STAR System thermal performance to I OCFR71 requirements is es...
The purpose of this review is to determine the adequacy of the High Flux Beam Reactor (HFBR) Technic...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
The Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR) spent-fuel-element shipping cask ...
The applicant's identification of potential accident situations in the vicinity of the plant is...
CSB reviews the information presented in the applicant's safety analysis report (SAR) concernin...
The purpose of this task (HFBR Restart Activity A2.6) is to perform a review of the design basis acc...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
This paper discusses a number of topics that relate safety analysis as documented in the Department ...
This report describes the methodology used in conducting the Canister Storage Building (CSB) hazard ...