This chapter of the Safety Evaluation Report (SER) evaluates the descriptions of all operations presented in the Safety Analysis Report (SAR) (Pacific Gas and Electric Company, 2004a) including systems, equipment, and instrumentation for clarity and completeness. Particular emphasis was placed on how operation systems relate to handling and storing spent nuclear fuel (SNF), confining nuclear material, and managing expected and potential radiological dose. The review of the operation systems included selected sections of Chapters 3, “Principal Design Criteria; ” 4, “ISFSI Design; ” 5, “ISFSI Operations; ” 8, “Accident Analysis; ” 9, “Conduct of Operations; ” and 10, “Operating Controls and Limits ” of the SAR and documents cited in the SAR. ...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
The objective of the staff’s shielding review is to determine whether the shielding design features ...
This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be adde...
Safety Analysis Report (SAR) (Pacific Gas and Electric Company, 2004a). The staff also reviewed docu...
(SAR) (Pacific Gas and Electric Company, 2004) provides information about the waste confinement and ...
This SRP section covers the review of the radiological consequences of a postulated fuel handling ac...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
The control room ventilation system and control building layout and structures, as described in the ...
Two proposed Safety Analysis Report format outlines for submission to the Nuclear Regulatory Commiss...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
The function of the spent fuel pool area ventilation system (SFPAVS) is to maintain ventilation in t...
This report summarizes work completed in support of the implementation of the DOE Safety Analysis an...
This chapter of the Safety Evaluation Report (SER) evaluates the decay heat removal systems; materia...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
The objective of the staff’s shielding review is to determine whether the shielding design features ...
This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be adde...
Safety Analysis Report (SAR) (Pacific Gas and Electric Company, 2004a). The staff also reviewed docu...
(SAR) (Pacific Gas and Electric Company, 2004) provides information about the waste confinement and ...
This SRP section covers the review of the radiological consequences of a postulated fuel handling ac...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
The control room ventilation system and control building layout and structures, as described in the ...
Two proposed Safety Analysis Report format outlines for submission to the Nuclear Regulatory Commiss...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
The function of the spent fuel pool area ventilation system (SFPAVS) is to maintain ventilation in t...
This report summarizes work completed in support of the implementation of the DOE Safety Analysis an...
This chapter of the Safety Evaluation Report (SER) evaluates the decay heat removal systems; materia...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
The objective of the staff’s shielding review is to determine whether the shielding design features ...
This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be adde...