The circulating water system (CWS) provides a continuous supply of cooling water to the main condenser to remove the heat rejected by the turbine cycle and auxiliary systems. 1. The ASB reviews the performance of the CWS with respect to its functional requirements and the effects of adverse environmental occurrences, abnormal operational transients, or accident conditions such as loss of offsite power. 2. The ASB reviews the CWS and its interfaces with other systems to determine that a malfunction, failure of a component, or failure of a circulating water pipe including the failure of an expansion joint do not have unacceptable adverse effects on the functional performance capabilities of safety-related systems located in the immediate area...
The ASB review of the structures, systems, and components (SSC) to be protected from externally gene...
Direct cycle boiling water reactor (BWR) plants have redundant quick-acting isola-tion valves on eac...
The transient that results from a postulated feedwater line break is sensitive to the break discharg...
The PSB reviews reactor auxiliary cooling water systems (CWS) that are required for safe shutdown du...
The ASB reviews reactor auxiliary cooling water systems (CWS) that are required for safe shutdown du...
The condensate storage facility (CSF) is provided to serve as a receiver for excess water generated ...
The ASB reviews the demineralized water makeup system (DWMS) from the supply con-nection of the serv...
For Mark I, II, and III- pressure-suppression type boiling water reactor (BWR) plant containments, t...
Boiling water reactor (BWR) plants include a standby liquid control system (SLCS) that provides back...
The ultimate heat sink (UHS) is the source of cooling water provided to dissipate reactor decay heat...
The function of the engineered safety feature ventilation system (ESFVS) is to provide a suitable an...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
The reactor coolant pressure boundary (RCPB) leakage detection systems are designed to provide a mea...
The CSB reviews the information in the applicant's safety analysis report (SAR) concerning cont...
(USAR) to allow the use of service water to directly supply cooling water to the reactor equipment c...
The ASB review of the structures, systems, and components (SSC) to be protected from externally gene...
Direct cycle boiling water reactor (BWR) plants have redundant quick-acting isola-tion valves on eac...
The transient that results from a postulated feedwater line break is sensitive to the break discharg...
The PSB reviews reactor auxiliary cooling water systems (CWS) that are required for safe shutdown du...
The ASB reviews reactor auxiliary cooling water systems (CWS) that are required for safe shutdown du...
The condensate storage facility (CSF) is provided to serve as a receiver for excess water generated ...
The ASB reviews the demineralized water makeup system (DWMS) from the supply con-nection of the serv...
For Mark I, II, and III- pressure-suppression type boiling water reactor (BWR) plant containments, t...
Boiling water reactor (BWR) plants include a standby liquid control system (SLCS) that provides back...
The ultimate heat sink (UHS) is the source of cooling water provided to dissipate reactor decay heat...
The function of the engineered safety feature ventilation system (ESFVS) is to provide a suitable an...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
The reactor coolant pressure boundary (RCPB) leakage detection systems are designed to provide a mea...
The CSB reviews the information in the applicant's safety analysis report (SAR) concerning cont...
(USAR) to allow the use of service water to directly supply cooling water to the reactor equipment c...
The ASB review of the structures, systems, and components (SSC) to be protected from externally gene...
Direct cycle boiling water reactor (BWR) plants have redundant quick-acting isola-tion valves on eac...
The transient that results from a postulated feedwater line break is sensitive to the break discharg...