Abstract: Cost estimation of highway projects with high accuracy at the conceptual phase of project development is crucial for planning and feasibility studies. However, a number of difficulties arise when conducting cost estimation during the conceptual phase. Major problems faced are lack of preliminary information, lack of database of road works costs, data missingness, lack of an appropriate cost estimation methods, and the involvement of uncertainties. Given its significance, conventional tools such as regression analysis have been widely employed to tackle the problem. However, recent statistical studies show that errors in cost estimation have not decreased. This paper focuses on the development of a more accurate estimation techniqu...
It is desirable to predict construction cost with a high level of accuracy in the early phase to com...
SUMMARY: This paper presents a study on the use of artificial neural networks (ANNs) in preliminary ...
This paper presents the development of prediction models for the unit costs of road works that could...
Estimating the total project cost early on the project conceptualization phase is very important to ...
Incomplete data and several unforeseen factors affect the accuracy of project cost estimates, especi...
Conceptual cost estimate can serve the owners’ feasibility estimate and assists in the establishment...
Professional paper Business carried out by construction companies is based on the implementation of ...
Cost estimation has its proven importance as one of essential factors for project success. The aim o...
Highway construction projects typically experience cost overruns and schedule delays, which could le...
Cost estimation has its proven importance as one of essential factors for project success. The aim o...
Neural network and regression models have been developed to predict the completed cost of competitiv...
requirements for the degree of Master of Science. This thesis is an attempt to explore the possibili...
Inaccurate estimation in highway projects represents a major problem facing planners and estimators,...
1642470https://doi.org/10.21949/15182892017PDFTech Reporthttps://ntlrepository.blob.core.windows.net...
Conceptual cost estimates play a crucial role in initial project decisions, although scope is not fi...
It is desirable to predict construction cost with a high level of accuracy in the early phase to com...
SUMMARY: This paper presents a study on the use of artificial neural networks (ANNs) in preliminary ...
This paper presents the development of prediction models for the unit costs of road works that could...
Estimating the total project cost early on the project conceptualization phase is very important to ...
Incomplete data and several unforeseen factors affect the accuracy of project cost estimates, especi...
Conceptual cost estimate can serve the owners’ feasibility estimate and assists in the establishment...
Professional paper Business carried out by construction companies is based on the implementation of ...
Cost estimation has its proven importance as one of essential factors for project success. The aim o...
Highway construction projects typically experience cost overruns and schedule delays, which could le...
Cost estimation has its proven importance as one of essential factors for project success. The aim o...
Neural network and regression models have been developed to predict the completed cost of competitiv...
requirements for the degree of Master of Science. This thesis is an attempt to explore the possibili...
Inaccurate estimation in highway projects represents a major problem facing planners and estimators,...
1642470https://doi.org/10.21949/15182892017PDFTech Reporthttps://ntlrepository.blob.core.windows.net...
Conceptual cost estimates play a crucial role in initial project decisions, although scope is not fi...
It is desirable to predict construction cost with a high level of accuracy in the early phase to com...
SUMMARY: This paper presents a study on the use of artificial neural networks (ANNs) in preliminary ...
This paper presents the development of prediction models for the unit costs of road works that could...