LHC commissioning made good progress in 2009 and 2010-a brief summary is presented. The present status of the machine is given and the short and medium term prospects discussed
The 2009 beam commissioning of the LHC injection and transfer lines will be reviewed. The measuremen...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
In 2008 the LHC saw a series of injection tests with beam and the start of full beam commissioning. ...
A brief overview of LHC operations over the last 3 years is provided. Luminosity performance has bee...
LHC beam commissioning re-started on the 20th November 2009 and continued for three and a half weeks...
After the September 19th 2008 incident and an intense year of recovery, consolidation and testing, L...
This chapter describes the current status of the LHC. General machine parameters are reviewed and th...
2010 will see the continuation of LHC beam commissioning. This will lead into a period of extended o...
In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulat...
The operational performance of the LHC machine both for proton and lead ion operation are reviewed ...
A history of the commissioning and the very successful early operation of the Large Hadron Collider ...
A history of the commissioning and the very successful early operation of the Large Hadron Collider ...
In preparation for the 2008 LHC beam operation, commissioning procedures were established by the com...
An LHC beam commissioning workshop was held on the 19-20 January 2010. The goal of this workshop is ...
The few weeks of LHC operation in 2009 was a resounding success with extremely fast progress in the ...
The 2009 beam commissioning of the LHC injection and transfer lines will be reviewed. The measuremen...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
In 2008 the LHC saw a series of injection tests with beam and the start of full beam commissioning. ...
A brief overview of LHC operations over the last 3 years is provided. Luminosity performance has bee...
LHC beam commissioning re-started on the 20th November 2009 and continued for three and a half weeks...
After the September 19th 2008 incident and an intense year of recovery, consolidation and testing, L...
This chapter describes the current status of the LHC. General machine parameters are reviewed and th...
2010 will see the continuation of LHC beam commissioning. This will lead into a period of extended o...
In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulat...
The operational performance of the LHC machine both for proton and lead ion operation are reviewed ...
A history of the commissioning and the very successful early operation of the Large Hadron Collider ...
A history of the commissioning and the very successful early operation of the Large Hadron Collider ...
In preparation for the 2008 LHC beam operation, commissioning procedures were established by the com...
An LHC beam commissioning workshop was held on the 19-20 January 2010. The goal of this workshop is ...
The few weeks of LHC operation in 2009 was a resounding success with extremely fast progress in the ...
The 2009 beam commissioning of the LHC injection and transfer lines will be reviewed. The measuremen...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
In 2008 the LHC saw a series of injection tests with beam and the start of full beam commissioning. ...