In 2015 LHC started operation at a beam energy of 6.5 TeV. After a two month beam commissioning period, first collisions were delivered in June 2015. To reach nominal performance with a bunch spacing of 25 ns, the first main hurdle was the conditioning of the vacuum chamber to suppress the phenomenon of electron clouds. The conditioning lasted for the rest of 2015 run, the LHC was operated at the limit of stability of the beams and of the cryogenic system. In November 2015 2244 bunches were stored in the machine, just 20% short of the nominal filling. This document will explain the challenges that had to be mastered in 2015. From the state of the LHC at the end of the 2015 run, projections for the performance for the period 2016-2018 will b...
For the 2015 LHC start up and operation, the injec-tors will be requested to provide a large variety...
The variety of beams, needed to set-up in the injectors as requested in the LHC, are reviewed, in te...
The Large Hadron Collider (LHC) project, now in the advanced construction phase at CERN, comprises t...
In 2015 the Large Hadron Collider (LHC) restarted for Run 2 after an almost two year long shutdown t...
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until ...
The brief experience with 25 ns beams in the LHC at the end of Run 1 suggested that the electron clo...
The LHC has been successfully operated at 6.5 TeV during 2015. An analysis of the critical parts of ...
In 2015 the Large Hadron Collider (LHC) entered the first year in its second long Run, after a 2-yea...
The Large Hadron Collider (LHC) at CERN (Geneva) was commissioned and operated in the years 2009-201...
After two years of intense work of consolidation and upgrading of the LHC and injector performance, ...
This paper shows the baseline LHC machine parameters for the 2015 start-up. Many systems have been u...
The first three year run of the Large Hadron Collider (LHC) ended in the spring of 2013. During this...
After the successful Run 1 (2010-2012), the LHC entered its first Long Shutdown period (LS1, 2013-20...
The LHC successfully returned to operation in April, 2015 after almost 2 years of Long Shutdown 1 (L...
For beam operation in 2015 a number of changes and improvements are foreseen for the machine cycle. ...
For the 2015 LHC start up and operation, the injec-tors will be requested to provide a large variety...
The variety of beams, needed to set-up in the injectors as requested in the LHC, are reviewed, in te...
The Large Hadron Collider (LHC) project, now in the advanced construction phase at CERN, comprises t...
In 2015 the Large Hadron Collider (LHC) restarted for Run 2 after an almost two year long shutdown t...
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until ...
The brief experience with 25 ns beams in the LHC at the end of Run 1 suggested that the electron clo...
The LHC has been successfully operated at 6.5 TeV during 2015. An analysis of the critical parts of ...
In 2015 the Large Hadron Collider (LHC) entered the first year in its second long Run, after a 2-yea...
The Large Hadron Collider (LHC) at CERN (Geneva) was commissioned and operated in the years 2009-201...
After two years of intense work of consolidation and upgrading of the LHC and injector performance, ...
This paper shows the baseline LHC machine parameters for the 2015 start-up. Many systems have been u...
The first three year run of the Large Hadron Collider (LHC) ended in the spring of 2013. During this...
After the successful Run 1 (2010-2012), the LHC entered its first Long Shutdown period (LS1, 2013-20...
The LHC successfully returned to operation in April, 2015 after almost 2 years of Long Shutdown 1 (L...
For beam operation in 2015 a number of changes and improvements are foreseen for the machine cycle. ...
For the 2015 LHC start up and operation, the injec-tors will be requested to provide a large variety...
The variety of beams, needed to set-up in the injectors as requested in the LHC, are reviewed, in te...
The Large Hadron Collider (LHC) project, now in the advanced construction phase at CERN, comprises t...