During Run 1 of the LHC the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. Significant upgrades were carried out to the injection kicker magnets during long shutdown 1, including a new design of beam screen to reduce the beam induced heating. Nevertheless these kicker magnets may limit the performance of HL-LHC unless additional, mitigating, measures are taken. Hence extensive simulations have been carried out to predict the distribution of the beam induced power deposition within the magnet and detailed thermal analyses carried out to predict the temperature profiles. To benchmark the simulations the predicted temperatures are compared with observ...
The Large Hadron Collider (LHC) under operation at CERN is colliding 3.5 TeV hadron beams which are ...
The Future Circular Collider for hadrons (FCC-hh) will require a fast injection kicker system that i...
The expected heat load induced on the beam screens has been evaluated for all the twin-bore magnets ...
The CERN Large Hadron Collider is equipped with two fast single-turn injection kicker systems that d...
The CERN Large Hadron Collider LHC is equipped with two fast pulsed magnet systems (MKIs) that injec...
The LHC injection kicker magnets (MKIs) experienced strong heating during the first operational run,...
The LHC injection kicker magnets experienced significant beam induced heating of the ferrite yoke, w...
During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Inje...
An upgrade of the LHC injection kickers is necessary for HL-LHC to avoid excessive beam induced heat...
The two LHC injection kicker magnet (MKI) systems must produce a kick of 1.3 T.m with a flat top dur...
The two LHC injection kicker systems produce an integrated field strength of 1.3 T·m with a flattop ...
Although no heating issues were observed in the Large Hadron Collider’s (LHC) injection kicker magne...
Prior to Long Shutdown 1 (LS1) one of the LHC injection kickers (MKIs) occasionally exhibited high t...
The CERN Large Hadron Collider (LHC) is equipped with two fast pulsed magnet systems (MKIs) that inj...
Two LHC injection kicker systems, each comprising 4 magnets per ring, produce a kick of 1.3 T·m with...
The Large Hadron Collider (LHC) under operation at CERN is colliding 3.5 TeV hadron beams which are ...
The Future Circular Collider for hadrons (FCC-hh) will require a fast injection kicker system that i...
The expected heat load induced on the beam screens has been evaluated for all the twin-bore magnets ...
The CERN Large Hadron Collider is equipped with two fast single-turn injection kicker systems that d...
The CERN Large Hadron Collider LHC is equipped with two fast pulsed magnet systems (MKIs) that injec...
The LHC injection kicker magnets (MKIs) experienced strong heating during the first operational run,...
The LHC injection kicker magnets experienced significant beam induced heating of the ferrite yoke, w...
During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Inje...
An upgrade of the LHC injection kickers is necessary for HL-LHC to avoid excessive beam induced heat...
The two LHC injection kicker magnet (MKI) systems must produce a kick of 1.3 T.m with a flat top dur...
The two LHC injection kicker systems produce an integrated field strength of 1.3 T·m with a flattop ...
Although no heating issues were observed in the Large Hadron Collider’s (LHC) injection kicker magne...
Prior to Long Shutdown 1 (LS1) one of the LHC injection kickers (MKIs) occasionally exhibited high t...
The CERN Large Hadron Collider (LHC) is equipped with two fast pulsed magnet systems (MKIs) that inj...
Two LHC injection kicker systems, each comprising 4 magnets per ring, produce a kick of 1.3 T·m with...
The Large Hadron Collider (LHC) under operation at CERN is colliding 3.5 TeV hadron beams which are ...
The Future Circular Collider for hadrons (FCC-hh) will require a fast injection kicker system that i...
The expected heat load induced on the beam screens has been evaluated for all the twin-bore magnets ...