The objective of this study was to evaluate technically semi-mechanized forest cutting costs in eucalypt plantations in first rotation, average slope of 26.22º (58.2%), spacing 3 x 2.5 m, 3 x 3.33 m and 3 x 4 m, with volumes of 0,326, 0,361 and 0,370 m3 per tree, in the 1+1 system (one chainsaw operator and a helper). The results showed that the activities that consume more time in cutting and processing with the chainsaw Stihl MS360 are: displacement, bucking and 1st, 2nd and 3rd cut. Spaced at 3 x 2.5 m, average productivity of was 4.69 m3·h-1 at a production cost of 5.16 R$·m-3. In the 3 x 3.33 m spacing average productivity was 5.19 m3·h-1 and 4.66 R$·m-3 and in the 3 x 4 m spacing was 5.73 m3·h-1 and 4.22 R$·m-3. The item of greatest i...
ABSTRACT Before performing any financial analysis costs must be calculated. These costs should allow...
A escolha do espaçamento de plantio tem como objetivo inicial proporcionar para cada árvore o espaço...
<p>In the present work a time study was conducted with the objective of adjusting equations to estim...
Plantation spacing selection has the primary objective of assigning each tree enough space for maxim...
<p>This study aimed to technically and economically evaluate the Feller-buncher in different conditi...
The acquisition of machinery used in timber harvesting depends on high financial investment, which i...
The rationalization of forest harvesting and minimization costs is a constant search by the managers...
Globally, about 20 million ha of land area is occupied by plantations of Eucalyptus. Motor-manual tr...
Australia’s eucalypt plantation estate (>900 000 ha) has largely been established since 1995. The ma...
The performance of alternative equipment for the whole-tree harvesting of eucalypt stands was evalua...
Este estudo foi conduzido em povoamentos de eucalipto de uma empresa florestal situada no Estado de ...
The main aims of this study were to determine the productivity, profitability and energy balance (ou...
Coppice regeneration of eucalypt plantations is increasingly being used in Australia to reduce re-es...
O objetivo deste trabalho foi avaliar técnica e economicamente o feller-buncher em dois subsistemas ...
There have been few comparative harvest system studies to provide a basis to understand the performa...
ABSTRACT Before performing any financial analysis costs must be calculated. These costs should allow...
A escolha do espaçamento de plantio tem como objetivo inicial proporcionar para cada árvore o espaço...
<p>In the present work a time study was conducted with the objective of adjusting equations to estim...
Plantation spacing selection has the primary objective of assigning each tree enough space for maxim...
<p>This study aimed to technically and economically evaluate the Feller-buncher in different conditi...
The acquisition of machinery used in timber harvesting depends on high financial investment, which i...
The rationalization of forest harvesting and minimization costs is a constant search by the managers...
Globally, about 20 million ha of land area is occupied by plantations of Eucalyptus. Motor-manual tr...
Australia’s eucalypt plantation estate (>900 000 ha) has largely been established since 1995. The ma...
The performance of alternative equipment for the whole-tree harvesting of eucalypt stands was evalua...
Este estudo foi conduzido em povoamentos de eucalipto de uma empresa florestal situada no Estado de ...
The main aims of this study were to determine the productivity, profitability and energy balance (ou...
Coppice regeneration of eucalypt plantations is increasingly being used in Australia to reduce re-es...
O objetivo deste trabalho foi avaliar técnica e economicamente o feller-buncher em dois subsistemas ...
There have been few comparative harvest system studies to provide a basis to understand the performa...
ABSTRACT Before performing any financial analysis costs must be calculated. These costs should allow...
A escolha do espaçamento de plantio tem como objetivo inicial proporcionar para cada árvore o espaço...
<p>In the present work a time study was conducted with the objective of adjusting equations to estim...