The Future Circular Collider (FCC) accelerator will require a helium distribution system that will exceed the presently exploited transfer lines by almost 1 order of magnitude. The helium transfer line will contain five process pipes protected against heat leaks by a common thermal shield. The design pressure of the FCC process pipe with supercritical helium will be equal to 5.0 MPa, significantly exceeding the 2.0 MPa value in the present, state-of–art transfer lines. The increase of the design pressure requires construction changes to be introduced to the support system, the vacuum barriers and the compensation bellows. This will influence heat flows to the helium. The paper analyses the impact of the increased design pressure on the heat...
The Cryogenic Current Comparator (CCC) and its purpose built cryostat were installed in the low-ener...
Performance of helium refrigerator or liquefier is affected significantly due to different kinds of ...
The cryogenic lines GHE and LN2 contain two lines each, one for supply and the other for return. The...
The Future Circular Collider (FCC) under study at CERN will produce 50-TeV high-energy proton beams....
The selection process for size in safety equipment for cold vessels or process pipes in cryogenic sy...
The distribution of helium for the Large Hadron Collider (LHC), at CERN, will require a large variet...
Ultra high vacuum in the beam pipe is a basic requirement for the Future Circular Colliders (FCC). T...
The cooling of the superconducting magnet cold masses with superfluid helium (He II) is a well-estab...
AbstractStrategies for smoothing pulsed heat loads are of great interest for future operation of lar...
Contract DE-AC07-05ID14517 The components of the intermediate heat transfer loop will be subjected t...
This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Fi...
LecturePg. 9-16Fluid catalytic cracking (FCC) hot gas expanders were developed in the early 1960s an...
A catastrophic failure of the RHIC magnet cooling lines, similar to the LHC superconducting bus fail...
In order to cool the superconducting magnets in RHIC, its helium refrigerator distributes 4.5 K heli...
International audienceThis paper reports on the development and the thermal tests of three superflui...
The Cryogenic Current Comparator (CCC) and its purpose built cryostat were installed in the low-ener...
Performance of helium refrigerator or liquefier is affected significantly due to different kinds of ...
The cryogenic lines GHE and LN2 contain two lines each, one for supply and the other for return. The...
The Future Circular Collider (FCC) under study at CERN will produce 50-TeV high-energy proton beams....
The selection process for size in safety equipment for cold vessels or process pipes in cryogenic sy...
The distribution of helium for the Large Hadron Collider (LHC), at CERN, will require a large variet...
Ultra high vacuum in the beam pipe is a basic requirement for the Future Circular Colliders (FCC). T...
The cooling of the superconducting magnet cold masses with superfluid helium (He II) is a well-estab...
AbstractStrategies for smoothing pulsed heat loads are of great interest for future operation of lar...
Contract DE-AC07-05ID14517 The components of the intermediate heat transfer loop will be subjected t...
This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Fi...
LecturePg. 9-16Fluid catalytic cracking (FCC) hot gas expanders were developed in the early 1960s an...
A catastrophic failure of the RHIC magnet cooling lines, similar to the LHC superconducting bus fail...
In order to cool the superconducting magnets in RHIC, its helium refrigerator distributes 4.5 K heli...
International audienceThis paper reports on the development and the thermal tests of three superflui...
The Cryogenic Current Comparator (CCC) and its purpose built cryostat were installed in the low-ener...
Performance of helium refrigerator or liquefier is affected significantly due to different kinds of ...
The cryogenic lines GHE and LN2 contain two lines each, one for supply and the other for return. The...